Method of filling and sealing a microtrench
AssigneeCciip LLC
InventorsAngelo J. Pino, Jr., Daniel Urban
Life of this patent
Estimating the term…
Abstract
Provided is a microtrench fill comprising concrete, a polymer, and a colorant. Also provided is a method of using the microtrench fill to fill a microtrench in a street or walkway.
Claims28
A method of simultaneously filling and sealing a microtrench containing an optical fiber and/or innerduct/microduct on a roadway to return the roadway to substantially an original state with a color-matched, filled and sealed microtrench comprising:
- forming a flowable concrete-based fill comprising cement, a polymer bonding agent, a colorant, an aggregate, and water, wherein the colorant provides the fill with a color substantially matching the color of the roadway, the polymer bonding agent provides adhesion to the existing roadway, and the flowable concrete-based fill is configured to flow into the microtrench from a fill device;
- and
- filling the microtrench with the flowable concrete-based fill material from the fill device to cover the optical fiber and/or innerduct/microduct, fill and seal the microtrench and return the roadway back to an original state with the color-matched, filled and sealed microtrench in one step.
A method of simultaneously filling and sealing a microtrench containing an optical fiber and/or innerduct/microduct on a roadway to return the roadway to substantially an original state with a filled and sealed microtrench comprising:
- forming a flowable concrete-based fill comprising cement, a polymer bonding agent, an aggregate, and water, wherein the polymer bonding agent provides adhesion to the existing roadway, and the flowable concrete-based fill is configured to flow into the microtrench from a fill device;
- and
- filling the microtrench with the flowable concrete-based fill material from the fill device to simultaneously cover the optical fiber and/or innerduct/microduct, fill and seal the microtrench and return the roadway back to an original state with the filled and sealed microtrench in one step.
Dependencies are inferred from the claim text.