Electric blender system, apparatus and method for use in fracturing underground formations using liquid petroleum gas
AssigneeTyphon Technology Solutions, LLC
InventorsTodd Coli, Eldon Schelske
Life of this patent
Estimating the term…
Loading patent…
AssigneeTyphon Technology Solutions, LLC
InventorsTodd Coli, Eldon Schelske
Estimating the term…
The present invention provides a method and system for providing on-site electrical power to a fracturing operation, and an electrically powered fracturing system. Natural gas can be used to drive a turbine generator in the production of electrical power. A scalable, electrically powered fracturing fleet is provided to pump fluids for the fracturing operation, obviating the need for a constant supply of diesel fuel to the site and reducing the site footprint and infrastructure required for the fracturing operation, when compared with conventional systems. The treatment fluid can comprise a water-based fracturing fluid or a waterless liquefied petroleum gas (LPG) fracturing fluid.
A system for hydraulic fracturing, comprising:
A method for delivering a fracturing fluid to a wellbore, comprising:
Dependencies are inferred from the claim text.