Peak cyclical workload-based storage management in a multi-tier storage environment
AssigneeInternational Business Machines Corporation
InventorsYong Guo, Kaisar R. Hossain, Jun Tao Li, Yan Xu
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsYong Guo, Kaisar R. Hossain, Jun Tao Li, Yan Xu
Estimating the term…
In one embodiment, a system includes a processor and logic integrated with and/or executable by the processor, the logic being configured to cause the processor to: collect, by the processor, workload information for a computing/storage device for a present time period and one or more previous time periods; determine, by the processor, a maximum workload parameter for the present time period and the one or more previous time periods; determine, by the processor, a maximum workload threshold that corresponds to the maximum workload parameter; compute, by the processor, a difference between the maximum workload threshold and the maximum workload parameter; and determine, by the processor, an amount of workload to move to the computing/storage device based on the difference. Other methods and computer program products are presented in additional embodiments.
A method for managing data, the method comprising:
A system, comprising a processor and logic integrated with and/or executable by the processor, the logic being configured to cause the processor to:
A computer program product for managing data, the computer program product comprising a computer readable storage medium having program code embodied therewith, the program code executable by a processor to cause the processor to:
Dependencies are inferred from the claim text.