Daily electricity generation plan making method of cascade hydraulic power plant group
AssigneeWuhan University
InventorsPan Liu, Bo Ming, Mengyue Ma, Xizhen Chen, Zejun Li, Wang Zhang
Life of this patent
Estimating the term…
Loading patent…
AssigneeWuhan University
InventorsPan Liu, Bo Ming, Mengyue Ma, Xizhen Chen, Zejun Li, Wang Zhang
Estimating the term…
A daily electricity generation planning method of a cascade hydropower plants is disclosed, and the method is comprised of the steps as follows: step 1, regardless of the constraints for opening and closing the generator, taking the power similarity between the power plant group and the typical demand as one of optimization objectives, and performing a first optimization to obtain a daily electricity generation plan; step 2, according to the derived daily electricity generation plan, determining an opening and closing status for the generator; and step 3, considering the constraints for opening and closing the generator, taking the power similarity between the power plant group and the typical demand as the optimization objective, performing a second optimization to obtain the daily electricity generation plan.
A daily electricity generation planning method of cascade hydropower plants, for optimize the economic benefits of the cascade hydropower plants, comprising the following steps of using a computer having a processor for:
Dependencies are inferred from the claim text.