Timing estimations for application lifecycle management work items determined through machine learning
AssigneeEntit Software LLC
InventorsShaul Strachan, George Kour, Raz Regev
Life of this patent
Estimating the term…
Loading patent…
AssigneeEntit Software LLC
InventorsShaul Strachan, George Kour, Raz Regev
Estimating the term…
In some examples, a method may include accessing data records of completed work items associated with managing a lifecycle of a software application and extracting feature values from the data records of the completed work items for a selected set of features. The method may also include determining timing data of state transitions for the completed work items from the data records and generating a predictor through machine learning using the timing data and the extracted feature values as input samples. The generated predictor may provide a transition probability of a particular state transition for a work item with specific feature values. The method may further include using the predictor to determine an estimated timing of the particular state transition for the uncompleted work item.
A method comprising:
A non-transitory machine-readable medium comprising instructions executable by a processing resource to:
A system comprising: