Flexible line installation and removal
AssigneeStatoil Petroleum AS
InventorsSteinar Kristoffersen, Guillaume Gravey, Øyvind Haug
Life of this patent
Estimating the term…
Loading patent…
AssigneeStatoil Petroleum AS
InventorsSteinar Kristoffersen, Guillaume Gravey, Øyvind Haug
Estimating the term…
A method of removing a flexible line deployed between an offshore platform and a subsea structure, where the platform has a landing deck on which the flexible line is installed, the landing deck facing away from the platform towards an installation side. The method comprises: decoupling a topside end of the flexible line from the landing deck; lowering the topside end from the landing deck to the sea bed using a platform mounted winch, and detaching the winch from the topside end; moving the platform in a direction away from the installation side and positioning an installation vessel on the installation side; lowering a recovery line from the installation vessel and attaching an end of the recovery line to the topside or subsea end of the riser; raising the attached topside or subsea end onto the installation vessel from the seabed using the recovery line; and recovering the flexible line onto the installation vessel, whereupon the platform can be moved back to an operating position.
A method of removing a flexible line deployed between an offshore platform and a subsea structure, where the platform has a landing deck on which the flexible line is installed, the landing deck facing away from the platform towards an installation side, the method comprising:
A method of installing a flexible line between an offshore platform and a subsea structure, where the platform has a landing deck for landing the flexible line, the landing deck facing away from the platform towards an installation side, the method comprising:
Dependencies are inferred from the claim text.