Back to results
US RE47,627 E1Granted
Hinged rail for barrier operators
AssigneeThe Chamberlain Group, Inc.
InventorBrian Roy Skotty
Life of this patent
Estimating the term…
Abstract
A movable barrier system wherein the trolley system comprises at least two guiding rail portions. At least one of the guiding rail portions is supported by a support member secured to the headroom area of the building support structure. The trolley traverses the at least two guiding rail portions by a hinged coupling device.
Claims13
An apparatus comprising:
- a trolley operably connected to an operator configured to effectuate movement of a movable barrier through movement of the trolley;
- a guiding rail configured to guide movement of the trolley, wherein the guiding rail includes a first rail section and a second rail section obliquely connected to each other with a hinged connecting point such that the trolley changes direction of travel when passing between the first rail section and the second rail section;
- a support member having a first and second end, the first end of the support member being coupled to one or more of the rail sections of the guiding rail or a connection between the rail sections of the guiding rail, wherein the support member is configured to counteract forces exerted on the guiding rail by the trolley during movement of the movable barrier.
A movable barrier operator apparatus comprising;
- an operator, the operator being attached to an upper support structure, wherein the operator is configured to effectuate movement of a movable barrier;
- a guiding rail having a first rail section and a second rail section, the first rail section having a first and second end, the first rail section being operably disposed adjacent to the operator at the first end;
- a hinged guiding rail connecting portion, the connecting portion being operably attached to the first rail section at the second end of the first rail section;
- the second rail section having a first and second end, the second rail section being operably attached to the connecting portion at the first end of the second rail section, the second rail section being operably supported by a building structure at the second end of the second rail section, wherein the first rail section and the second rail section are connected obliquely relative to each other when connected to the guiding rail connecting portion;
- a trolley configured to travel the length of the guiding rail in response to control of the operator, the trolley further being configured to move a movable barrier during the trolley's movement along the guiding rail, wherein the trolley is configured to change direction of travel when passing between the first rail section and the second rail section;
- a support member, the support member having a first and second end, the first end of the support member being attached to a building structure, the second end of the support member being coupled to one or more of the two rail sections or the connecting portion.
3 more elements
Dependencies are inferred from the claim text.