Correcting time shifts
AssigneePGS Geophysical AS
InventorsJyoti Kumar, Guilherme Jangelme
Life of this patent
Estimating the term…
Loading patent…
AssigneePGS Geophysical AS
InventorsJyoti Kumar, Guilherme Jangelme
Estimating the term…
At least some of the example embodiments are methods including: performing Normal MoveOut (NMO) correction on a first Common Depth Point (CDP) gather, the NMO correction based on a reference velocity of sound in water, the NMO correction creates first NMO data with a plurality of traces; selecting a first estimated velocity that makes travel time represented in the traces substantially the same; calculating a zero-offset time shift that represents a difference in travel time as between the reference velocity and the first estimated velocity at a zero-offset trace; performing NMO correction on the first CDP gather based on a final estimated velocity to create second NMO data; adding the zero-offset time shift to each trace of the second NMO data; and then performing reverse NMO correction on the second NMO data to create corrected data.
A computer-implemented method of preparing Common Depth Point (CDP) gathers by:
Dependencies are inferred from the claim text.