A method of manufacturing a Heating, Ventilating and Air Conditioning (HVAC) unit, the method comprising:
- coupling a first switch to a controller using a first parallel wiring harness;
- coupling the first switch to a second switch using a second parallel wiring harness;
- wherein designated combinations of a plurality of terminals of the first switch indicate a circuit configuration for employing the first switch in the HVAC unit;
- and
- wherein the first parallel wiring harness comprises a first connection header configured to connect to one of the designated combinations to implement a particular circuit configuration.