# US 9,869,155 B2 · Yielding of hydrated lime in set-delayed and other settable compositions

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,869,155 B2
- Document ID: US9869155B2
- Status: Granted
- Kind: B2
- Application number: 14/910,886
- Filed: 2013-09-09
- Published: 2016-07-07
- Granted: 2018-01-16
- Earliest claimed: 2013-09-09
- Assignees: Halliburton Energy Services, Inc.
- Applicants: Halliburton Energy Services, Inc.
- Inventors: Thomas Jason Pisklak; Samuel J. Lewis; Kyriacos Agapiou; Peter James Bou; Pauline Akinyi Otieno; Lance Everett Brothers; Ronnie Glen Morgan
- Web page: https://patentgrep.com/patent/US9869155B2

## CPC

- E21B 33/13: Methods or devices for cementing, for plugging holes, crevices or the like
- B28C 5/34: Mixing on or by conveyors {, e.g. by belts or chains provided with mixing elements}
- B28C 7/028: {by counting the number of revolutions performed, or by measuring the mixing time}
- C04B 28/02: containing hydraulic cements other than calcium sulfates
- C04B 28/04: Portland cements
- C04B 28/06: Aluminous cements (monolithic refractories or refractory mortars C04B35/66)
- C04B 28/08: Slag cements
- C04B 28/10: Lime cements or magnesium oxide cements
- C04B 28/14: containing calcium sulfate cements {(gypsum-paper plates E04C)}
- C04B 28/34: containing cold phosphate binders
- C09K 8/46: containing inorganic binders, e.g. Portland cement
- C09K 8/467: containing additives for specific purposes
- E21B 21/062: {by mixing components}
- E21B 33/14: for cementing casings into boreholes
- Y02W 30/91: Use of waste materials as fillers for mortars or concrete
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- B28C: PREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER (preparing material for foundry moulds B22C5/00)
- C04B: LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE {(roofing granules E04D7/005)}; CERAMICS (devitrified glass-ceramics C03C10/00); REFRACTORIES; TREATMENT OF NATURAL STONE
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- Y02W: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT

## Abstract

Methods and systems directed to controlling the rheology of settable compositions in subterranean formations. Embodiments include a method of controlling the rheology of a set-delayed cement composition, the method comprising: providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; shearing the set-delayed cement composition in an amount sufficient to substantially prevent solids settling; storing the set-delayed cement in a pumpable fluid state for at least 1 day; activating the set-delayed cement composition; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation. Additional methods and systems are also provided.

## Claims

### Claim 1

A method of controlling a rheology of a set-delayed cement composition, the method comprising:
providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder, wherein the set-delayed cement composition has a pumice-to-hydrated-lime weight ratio of about 3:1 to about 5:1, wherein the set retarder is present in an amount of about 0.01% to about 2% by weight of the pumice;
shearing the set-delayed cement composition until a log-log-slope value is about 1.05 or lower to substantially prevent solids settling;
storing the set-delayed cement composition in a pumpable fluid state for at least 1 day;
activating the set-delayed cement composition;
pumping the set-delayed cement composition in a fluid state into a subterranean formation; and
allowing the set-delayed cement composition to set in the subterranean formation.

### Claim 2 (depends on 1)

The method of claim 1 wherein the set-delayed cement composition is sheared by recirculating the set-delayed cement composition with a circulating pump.

### Claim 3 (depends on 2)

The method of claim 2 wherein the set-delayed cement composition is recirculated at a rate between about 300 gallons per minute to about 800 gallons per minute.

### Claim 4 (depends on 1)

The method of claim 1 wherein the log-log-slope is a slope of a shear stress vs. shear rate curve in log-log space.

### Claim 5 (depends on 1)

The method of claim 1 wherein the set-delayed cement composition is sheared until the log-log-slope value is about 1.05 or lower and until the hydrated lime has yielded; wherein the lime has yielded when at least one condition is met; the at least one condition being selected from the group consisting of: the set-delayed cement composition has a residual stress increase of about 2 to about 20 fold, the set-delayed cement composition has an increase in volumetric average apparent viscosity of about 35%, and the set-delayed cement composition further has a reduction in the log-log-slope of about 25%; wherein the log-log-slope is a slope of a shear stress vs. shear rate curve in log-log space.

### Claim 6 (depends on 1)

The method of claim 1 wherein the set-delayed cement composition is essentially free of water viscosifying suspension additives.

### Claim 7 (depends on 1)

The method of claim 1 wherein the set retarder comprises at least one retarder selected from the group consisting of a phosphonic acid, a phosphonic acid derivative, a lignosulfonate, a salt, an organic acid, a carboxymethylated hydroxyethylated cellulose, a synthetic co- or ter-polymer comprising sulfonate and carboxylic acid groups, a borate compound, and any mixture thereof.

### Claim 8 (depends on 1)

The method of claim 1 wherein the set-delayed cement composition further comprises a dispersant selected from the group consisting of a sulfonated-formaldehyde-based dispersant, a polycarboxylated ether dispersant, and a combination thereof.

### Claim 9 (depends on 8)

The method of claim 8 wherein the dispersant is the polycarboxylated ether dispersant, and the polycarboxylated ether dispersant is present in an amount of about 0.01% to about 2% by weight of the pumice.

### Claim 10 (depends on 1)

The method of claim 1 wherein the activating the set-delayed cement composition step comprises adding a cement set activator to the set-delayed cement composition and the cement set activator comprises at least one cement set activator selected from the group consisting of calcium chloride, triethanolamine, sodium silicate, zinc formate, calcium acetate, sodium hydroxide, monovalent salt, sodium sulfate, nanosilica, polyphosphate, sodium hexametaphosphate, and any combination thereof.

### Claim 11

A method of controlling a rheology of a settable composition, the method comprising:
providing a settable composition comprising water, hydrated lime, and a material selected from the group consisting of a Portland cement, a pozzolanic cement, a gypsum cement, a soil cement, a calcium phosphate cement, a high-alumina content cement, a silica cement, a high-alkalinity cement, a slag cement, cement kiln dust, pumice, and mixtures thereof, wherein the material is present in a material-to-hydrated-lime weight ratio of about 3:1 to about 5:1;
shearing the settable composition until a log-log-slope value is about 1.05 or lower to substantially prevent solids settling;
pumping the settable composition in a fluid state into a subterranean formation; and
allowing the settable composition to set in the subterranean formation.

### Claim 12 (depends on 11)

The method of claim 11 wherein the settable composition is sheared by recirculating the settable composition with a circulating pump.

### Claim 13 (depends on 12)

The method of claim 12 wherein the settable composition is recirculated at a rate between about 300 gallons per minute to about 800 gallons per minute.

### Claim 14 (depends on 11)

The method of claim 11 wherein the log-log-slope is a slope of a shear stress vs. shear rate curve in log-log space.

### Claim 15 (depends on 11)

The method of claim 11 wherein the settable composition is sheared until the log-log-slope value is about 1.05 or lower and until the hydrated lime has yielded; wherein the lime has yielded when at least one condition is met; the at least one condition being selected from the group consisting of: the settable composition has a residual stress increase of about 2 to about 20 fold, the settable composition has an increase in volumetric average apparent viscosity of about 35%, and the settable composition further has a reduction in the log-log slope of about 25%; wherein the log-log-slope is a slope of a shear stress vs. shear rate curve in log-log space.

### Claim 16 (depends on 11)

The method of claim 11 wherein the settable composition is essentially free of water viscosifying suspension additives.

### Claim 17

A system for controlling a rheology of a set-delayed cement composition, the system comprising:
a set-delayed cement composition comprising:
water;
pumice;
hydrated lime, wherein the set-delayed cement composition has a pumice-to-hydrated-lime weight ratio of about 3:1 to about 5:1; and
a set retarder, wherein the set retarder is present in an amount of about 0.01% to about 2% by weight of the pumice; and
mixing equipment configured to shear the set-delayed cement composition until a log-log-slope value is about 1.05 or lower to substantially prevent solids settling in the set-delayed cement composition; and
pumping equipment configured to pump the set-delayed cement composition in a fluid state into a wellbore.

### Claim 18 (depends on 17)

The system of claim 17 wherein the mixing equipment comprises a circulating pump and wherein the circulating pump recirculates the set-delayed cement composition at a rate between about 300 gallons per minute to about 800 gallons per minute.

### Claim 19 (depends on 17)

The system of claim 17 further comprising storage equipment for storage of the set-delayed cement composition; and a cement set activator for activation of the set-delayed cement composition, and wherein the cement set activator comprises at least one cement set activator selected from the group consisting of calcium chloride, triethanolamine, sodium silicate, zinc formate, calcium acetate, sodium hydroxide, monovalent salt, sodium sulfate, nanosilica, polyphosphate, sodium hexametaphosphate, and any combination thereof.

### Claim 20

A method of controlling a rheology of a set-delayed cement composition, the method comprising:
providing a set-delayed cement composition comprising water, pumice, hydrated lime, a set retarder, and a dispersant, wherein the set-delayed cement composition has a pumice-to-hydrated-lime weight ratio of about 3:1 to about 5:1, wherein the set retarder is present in an amount of about 0.01% to about 2% by weight of the pumice, and wherein the dispersant is a polycarboxylated ether dispersant, and the polycarboxylated ether dispersant is present in an amount of about 0.01% to about 2% by weight of the pumice;
shearing the set-delayed cement composition until a log-log-slope value is about 1.05 or lower to substantially prevent solids settling;
storing the set-delayed cement composition in a pumpable fluid state for at least 1 day;
activating the set-delayed cement composition;
introducing the set-delayed cement composition into a subterranean formation; and
allowing the set-delayed cement composition to set in the subterranean formation.