Prediction of available generator running time
AssigneeSchneider Electric USA, Inc.
InventorsMarkus F. Hirschbold, John C. Van Gorp
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchneider Electric USA, Inc.
InventorsMarkus F. Hirschbold, John C. Van Gorp
Estimating the term…
At least one aspect of the invention is directed to a power monitoring system including a generator coupled to a fuel tank, a plurality of monitors, and a processor configured to monitor one or more loads drawing power from the generator; monitor one or more parameters that affect the amount of power drawn by the one or more loads; monitor a fuel consumption rate of the generator; generate one or more load profiles for each of the one or more loads; receive a set of the one or more loads for which a predicted time is to be generated; receive values for the one or more parameters; generate a predicted load profile for the set of the one or more loads and the values of the one or more parameters; receive information indicating an amount of remaining fuel; and calculate a predicted available run time.
A method of predicting available run time of a generator to power a facility, the method comprising:
A power monitoring system for a facility, comprising:
A non-transitory computer readable medium having stored thereon sequences of instruction for predicting available run time for a generator including instructions that will cause at least one processor to:
Dependencies are inferred from the claim text.