Power generation system and method of operating power generation system
AssigneePanasonic Intellectual Property Management Co., Ltd.
InventorsAkinori Yukimasa, Hiroshi Tatsui, Kiyoshi Taguchi, Shigeru Iiyama
Life of this patent
Estimating the term…
Loading patent…
AssigneePanasonic Intellectual Property Management Co., Ltd.
InventorsAkinori Yukimasa, Hiroshi Tatsui, Kiyoshi Taguchi, Shigeru Iiyama
Estimating the term…
A power generation system includes: a combustor operative to combust a fuel; a power generator operative to utilize energy obtained from the combustor when generating electric power; a fuel supplier operative to supply the fuel to the combustor; an air supplier operative to supply combustion air to the combustor; a discharged gas passage through which a discharged gas from the combustor flows; a CO detector operative to detect CO in the discharged gas; a temperature detector operative to detect a temperature of the discharged gas; and control circuitry operative to, when the discharged gas is flowing through the discharged gas passage, perform at least one of an operation of detecting a structural abnormality of the discharged gas passage based on a difference between detected temperatures of the temperature detector relative to a difference between heated amounts of the discharged gas heated by a heater and an operation of detecting the structural abnormality of the discharged gas passage based on the difference between the detected temperatures of the temperature detector relative to a difference between outputs of at least one of the fuel supplier and the air supplier.
A power generation system comprising:
A method of operating a power generation system,
Dependencies are inferred from the claim text.