Systems and methods for producing gas wells with multiple production tubing strings
AssigneeBP Corporation North America Inc.
InventorsMichael Elgie Aman, Paul A. Edwards, Timothy Idstein
Life of this patent
Estimating the term…
Loading patent…
AssigneeBP Corporation North America Inc.
InventorsMichael Elgie Aman, Paul A. Edwards, Timothy Idstein
Estimating the term…
A system for producing hydrocarbons from a subterranean well including a wellbore extending from a surface into a subterranean formation, the system including a wellhead disposed at the surface. In addition, the system includes a production tree coupled to the wellhead. Further, the system includes a casing coupled to the wellhead and extending into the wellbore. Still further, the system includes a first plurality of production tubing strings extending into the casing from the wellhead to a first production zone. Each of the first plurality of production tubing strings is configured to provide a fluid flow path for gases from the first production zone. The production tree is configured to selectively and independently control fluid flow through each of the first plurality of production tubing strings.
A method for producing gas from a well including a wellbore extending from a surface into a subterranean formation, the method comprising:
A system for producing hydrocarbons from a subterranean well including a wellbore extending from a surface into a subterranean formation, the system comprising:
A method for producing gas from a well including a wellbore extending from a surface into a subterranean formation, the method comprising:
A method for producing gas from a well including a wellbore extending from a surface into a subterranean formation, the method comprising:
The method of 15, wherein (c) comprises flowing gas from the first production zone through the first production tubing string at a first velocity, wherein the first velocity is greater than the critical velocity.
Dependencies are inferred from the claim text.