Method and system for parallel simulation models
AssigneeExxonMobil Upstream Research Company
InventorSerguei Maliassov
Life of this patent
Estimating the term…
Loading patent…
AssigneeExxonMobil Upstream Research Company
InventorSerguei Maliassov
Estimating the term…
A method for modeling a hydrocarbon reservoir. A representation of a simulation model is generated in a non-transitory, computer readable medium. The simulation model is used to generate computational tasks. The tasks are allocated among a plurality of computational nodes. Each processing node of the plurality of computational nodes includes core processors and a shared memory accessible by the core processors. The reservoir simulation is executed on the plurality of computational nodes. During the reservoir simulation, if a first processing node in the plurality of computational nodes finishes executing its allocated tasks, a migration request is sent from the first processing node to another processing node in the plurality of computational nodes. The migration request is configured to request migration of a movable task from the other processing node to the first processing node. The movable task is migrated from the other processing node to the first processing node.
A method for executing a reservoir simulation, comprising:
A system for modeling reservoir properties, comprising:
A non-transitory, computer readable medium comprising code configured to direct a processor to:
Dependencies are inferred from the claim text.