Pre-stressed molded wall, and method for creating such a wall
AssigneeSoletanche Freyssinet
InventorsErik Mellier, Thierry Jeanmaire, Memphis Loygue
Life of this patent
Estimating the term…
Abstract
The invention relates to a prestressed diaphragm wall in the ground (10) including a concrete panel (52), at least one anchor tube open at its upper end (38) and closed at its lower end (36) and, embedded at least partially in the concrete panel, at least one cable (60) extending inside the anchor tube (30), a lower portion of the cable (60) being fixed to said tube (30), and a cable anchoring system (90), configured to hold the cable in tension (60) and secure its upper portion (68) to the upper portion of the concrete panel (52). It also relates to a method for making a prestressed diaphragm wall.
Claims26
A method for making a prestressed diaphragm wall in the ground, the method comprising:
- an excavation is made in the ground with a profile corresponding to that desired for the diaphragm wall,
- at least one anchor tube, open at its upper end and closed at its lower end, is placed in the excavation, so that its lower end is directed toward a bottom of the excavation,
- concrete is poured into a volume of the excavation outside said anchor tube, so as to form a concrete panel,
- a cable is placed inside the anchor tube,
- a lower portion of the cable is fixed to a lower portion of the anchor tube,
- after fixing, tension is exerted on the cable so as to place the cable in tension, and
- the cable is locked in tension with respect to the concrete panel.
A method for making a prestressed retaining assembly including a diaphragm wall in the ground and a crowning structure capping said diaphragm wall, said method comprising:
- an excavation is made in the ground with a profile corresponding to that desired for the diaphragm wall,
- at least one anchor tube open at its upper end and closed at its lower end is placed in the excavation, so that its lower end is directed toward a bottom of the excavation,
- concrete is poured into a volume of the excavation outside said anchor tube, so as to form a concrete panel,
- after hardening of the concrete panel, a crowning structure is made overhanging the upper face of the concrete panel, so that the inside of the anchor tube remains accessible from the upper face of said structure,
- a cable is placed inside the anchor tube,
- a lower portion of the cable is fixed to a lower portion of the anchor tube,
- tension is exerted on the cable so as to place the cable in tension, and
- the cable is locked in tension with respect to the concrete panel and to the crowning structure.
A prestressed diaphragm wall in the ground, comprising:
- a concrete panel,
- at least one anchor tube having an upper portion and a lower portion, and open at its upper end and closed at its lower end, and embedded at least partially in the concrete panel,
- at least one cable extending inside the anchor tube, a lower portion of the cable being fixed to said tube,
- a cable anchoring system, configured to maintain the cable in tension and secure its upper portion to an upper portion of the concrete panel.
Dependencies are inferred from the claim text.