Bricks and a method for using such bricks to build dikes in water
OwnerTsun Chowinventor
Life of this patent
Estimating the term…
Loading patent…
OwnerTsun Chowinventor
Estimating the term…
The present invention discloses a brick, comprising a brick body, which comprises at least one slot position for connecting a column, and a method for using the bricks to build dikes in water, including the following steps: (1) drilling a plurality of pile holes at water bottom; (2) casting concrete into each of the pile holes to form concrete columns; (3) stacking up a number of the bricks along the concrete columns and having them tightly connected to form a wall; (4) filling the clearances between the concrete columns and the bricks with mortar. The bricks and dike building method provided by the present invention are suitable for direct over-water dike building, the construction is fast and the dikes built are firm and stable, have superior waterproof function and can effectively prevent the impact of currents, winds and waves.
A method for building dikes in water, comprising the following steps:
The method for building dikes in water according to 1, wherein the brick body of the brick comprises two slot positions which are at two ends of the brick body respectively;
The method for building dikes in water according to 2, wherein a hollow column and/or a hollow wall penetrating upper and lower surfaces of the brick body is disposed in the middle of the brick body;
The method for building dikes in water according to 3, wherein the upper edge of the side wall of the hollow wall is lower than the upper edge of the brick body;
The method for building dikes in water according to 1, wherein in the step (1), the pile holes are extended in two rows;
The method for building dikes in water according to 5, wherein in the step (5), the wall in top layer is a single-row wall.
The method for building dikes in water according to 1, wherein the release structure is a chasm on a side of the ship body;
The method for building dikes in water according to 7, wherein the quantity of the drilling rig devices is more than two and the drilling rig devices are distributed in an equal space;
The method for building dikes in water according to 1, wherein the ship body further comprises a concrete production unit which is on a side of the ship body opposite to the drilling rig device;
The method for building dikes in water according to 1, wherein the ship body further comprises a number of vertical hydraulic units and/or a number of oblique hydraulic units;
The method for building dikes in water according to 10, wherein the ship body comprises a number of sealing column sleeves for the drill stems or the hydraulic columns to pass through.
The method for building dikes in water according to 11, wherein the quantity of the vertical hydraulic units is at least four and the vertical hydraulic units are disposed at four end angles of the ship body;
The method for building dikes in water according to 1, wherein the ship body further comprises support frames which is consistent with the drilling rig devices in quantity;
The method for building dikes in water according to 13, wherein the support frames further comprise tightening structures for tightening the drill bushing.
The method for building dikes in water according to 14, wherein the tightening structures are tightening screws.
The method for building dikes in water according to 1, wherein bottom and top of the ship body comprises airtight compartments.
The method for building dikes in water according to 16, wherein there are a plurality of airtight compartments which are mutually isolated.
Dependencies are inferred from the claim text.