Back to results
US 9,644,369 B2Granted
Post-tension concrete leave out splicing system and method
AssigneeReigstad & Associates, Inc.
InventorGordon H. Reigstad
Life of this patent
Estimating the term…
Abstract
Devices, systems, and methods for constructing post-tensioned concrete slabs in a new floor construction that has a reduced gap distance between the slabs. The devices, systems, and methods can improve project construction time by reducing the time delay in accessing the floor underneath the slabs due to safety and/or weather conditions.
Claims15
A concrete floor construction, comprising:
- a first post-tensioned concrete slab, a second post-tensioned concrete slab, and a splice assembly, the splice assembly including a cavity-forming device, and a sleeve for receiving the cavity-forming device,
- the first post-tensioned concrete slab and the second post-tensioned concrete slab having respective upper surfaces that are generally aligned,
- the first post-tensioned concrete slab including a plurality of first rebars installed therein, the first post-tensioned concrete slab being post-tensioned in at least a direction substantially parallel to the plurality of first rebars,
- the second post-tensioned concrete slab including a plurality of second rebars installed therein, the second post-tensioned concrete slab being post-tensioned in at least a direction substantially parallel to the plurality of second rebars,
- the first post-tensioned concrete slab and second post-tensioned concrete slab being separated by a gap so that the concrete material of the first post-tensioned concrete slab is not in contact with the concrete material of the second post-tensioned concrete slab,
- the sleeve being installed in the first post-tensioned concrete slab,
- the cavity-forming device being inserted inside the sleeve, and
- the cavity-forming device having a cavity, wherein the cavity contains a portion of one of the second rebars.
5 more elements
A method for making a concrete floor construction including a first post-tensioned concrete slab and a second post-tensioned concrete slab separated by a gap, comprising:
- forming the first post-tensioned concrete slab with a plurality of first rebars, the first post-tensioned concrete floor slab being post-tensioned in at least a direction substantially parallel to the plurality of first rebars, wherein the first post-tensioned concrete slab includes a splice assembly, the splice assembly including a cavity-forming device inserted into a sleeve along the direction of the first rebars, the cavity-forming device with a cavity having an opening towards an end of the first post-tensioned concrete slab;
- prior to pouring a second concrete slab, positioning one of a plurality of second rebars for the second concrete slab so that a portion of the one of the plurality of second rebars is inside the cavity;
- pouring the second concrete slab;
- forming the second post-tensioned concrete slab by tensioning the second concrete slab in at least a direction substantially parallel to the plurality of second rebars, thus forming the gap between the first post-tensioned concrete slab and the second post-tensioned concrete slab, wherein the gap has a longer dimension for one side-to-side and a shorter dimension for another side-to-side, the shorter dimension being shorter relative to the longer dimension;
- and
- after forming the second post-tensioned concrete slab, securely fixing the portion of the one of the plurality of the second rebars in the cavity through an opening at a top surface of the first post-tensioned concrete slab created by the sleeve.
3 more elements
Dependencies are inferred from the claim text.