# US 9,574,406 B2 · Wellbore completion system with reaming tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,574,406 B2
- Document ID: US9574406B2
- Status: Granted
- Kind: B2
- Application number: 13/449,398
- Filed: 2012-04-18
- Published: 2012-08-09
- Granted: 2017-02-21
- Earliest claimed: 2010-10-20
- Assignees: Deep Casing Tools, Ltd.
- Applicants: Lance S. Davis; Edward D. Scott; Mark W. Presslie
- Inventors: Lance S. Davis; Edward D. Scott; Mark W. Presslie
- Web page: https://patentgrep.com/patent/US9574406B2

## CPC

- E21B 10/26: Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers (percussion drill bits with leading portion E21B10/40)
- E21B 7/20: Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
- E21B 7/203: {using down-hole drives}
- E21B 10/322: {cutter shifted by fluid pressure (E21B10/345 takes precedence)}
- E21B 17/14: Casing shoes {for the protection of the bottom of the casing}
- E21B 21/12: using drilling pipes with plural fluid passages, e.g. closed circulation systems
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A completion system comprises tubular components coupled together to form a completion string. In-flow control devices are provided to permit selective fluid communication between an internal bore of the completion string and the annulus. A reaming tool is provided at a leading end of the completion string and the reaming tool is run into the borehole with the completion string. The reaming tool comprises a fluid-powered drive unit, a reaming body and a reaming nose. In use, the completion string is located in the borehole and fluid is directed to the reaming tool to facilitate reaming of the borehole. A second tubular in the form of a washpipe may extend through an internal bore of the completion string for providing fluid to the reaming tool. The reaming tool is operable at a fluid pressure below a pressure which would activate the in-flow control devices.

## Claims

### Claim 1

A completion system comprising: a fluid powered reaction turbine coupled to a reaming tool, the reaming tool configured for coupling to a completion string insertable into a borehole, the completion string comprising at least one fluid pressure activated element, wherein the turbine is configured to be powered using fluid supplied at a pressure below an activation pressure of the at least one fluid pressure activated element, wherein the reaction turbine comprises at least one stator element and at least one rotor element, the at least one stator element and the at least one rotor element having a plurality of circumferentially spaced apart blades, a curvature, a pitch, a circumferential spacing between blades and a number of blades being such that a pressure drop across the reaction turbine when the motor is stalled is maximized, and wherein the pressure drop across the reaction turbine is smaller when the motor is stalled than when the motor is rotating.

### Claim 2 (depends on 1)

The completion system of claim 1 wherein the turbine is configured to prevent the operating pressure exceeding the activation pressure of the at least one fluid pressure activated element.

### Claim 3 (depends on 1)

The system of claim 1 wherein the at least one stator element and the at least one rotor element each having at least one blade wherein the curvature, the pitch, the circumferential spacing between blades and the number of blades on each of the at least one stator element and on the at least one rotor element are selected to provide a predetermined minimum fluid flow rate at which rotation of the at least one rotor element begins.

### Claim 4 (depends on 1)

The system of claim 1, wherein the fluid powered turbine is concentrically mounted about a central axis of the reaming tool.

### Claim 5 (depends on 1)

The system of claim 1, wherein the fluid powered turbine comprises a plurality of modules, each module comprising a rotor element and a stator element, a number of the modules selected to provide a selected pressure drop for a selected length of the fluid powered turbine.

### Claim 6 (depends on 1)

The system of claim 1, further comprising a tubular insertable into an interior of the completion system for delivering the fluid to the reaming tool.

### Claim 7 (depends on 6)

The system of claim 6, wherein the insertable tubular comprises a concentric pipe string.

### Claim 8 (depends on 6)

The system of claim 6, wherein the insertable tubular comprises a washpipe.

### Claim 9 (depends on 1)

The system of claim 1, wherein the at least one pressure activated element comprises one of a valve, a liner hanger, a fluid control device, a packer, an inflow control device (ICD), a sand screen, and a fluid-permeable member.

### Claim 10 (depends on 9)

The system of claim 9, wherein the at least one pressure activated element further comprises a barrier member.

### Claim 11 (depends on 1)

The system of claim 1, further comprising a reaming nose forming a leading end of the reaming tool and a reaming tool body coupled to an output of the fluid powered turbine.

### Claim 12 (depends on 11)

The system of claim 11, wherein at least one of the reaming body and the reaming nose further comprises at least one fluid port for directing fluid to the exterior of the reaming tool.

### Claim 13 (depends on 11)

The system of claim 11, wherein at least one of the reaming body and the reaming nose are rotationally balanced.

### Claim 14 (depends on 11)

The system of claim 11, wherein the reaming tool further comprises a geometric reaming structure formed in, or provided on, at least one of the reaming body and the reaming nose.

### Claim 15 (depends on 1)

The system of claim 1, further comprising at least one of: at least one downhole tractor, at least one vibration device, and a centraliser configured to assist in running the completion system into the borehole.

### Claim 16

A method of running a completion system into a pre-drilled borehole, the method comprising: coupling a reaming tool rotated by a reaction turbine to a completion string, the completion string having at least one pressure activated component thereon; directing motive fluid to the reaction turbine to power the reaming tool, the motive fluid supplied at a pressure below an activation pressure of the at least one pressure activated component; and observing a fluid pressure while the reaming tool is rotating and reducing an axial loading on the reaming tool when a drop in the observed pressure takes place, wherein blades in the reaction turbine have at least one of a number thereof, a circumferential spacing therebetween, a pitch and a curvature being such that a pressure drop across the reaction turbine during when the motor is stalled is maximized and wherein the pressure drop across the reaction turbine is smaller when the motor is stalled than when the motor is rotating.

### Claim 17 (depends on 16)

The method of claim 16, comprising running the completion system into the borehole substantially without rotation.

### Claim 18 (depends on 16)

The method of claim 16, wherein the turbine has a selected minimum flow rate at which rotation thereof is initiated, and pumping a selected fluid through the completion string and the reaming tool without rotating the reaming tool.

### Claim 19 (depends on 18)

The method of claim 18 wherein the selected fluid comprises one of cement and lost circulation material.

### Claim 20 (depends on 16)

The method of claim 16 further comprising running a tubular member into the completion string and delivering the fluid to the reaming tool via the tubular member.

### Claim 21 (depends on 20)

The method of claim 20 further comprising retrieving the tubular member from the borehole.
