Recovery in connection-oriented network
AssigneeTelefonaktiebolaget LM Ericsson (publ)
InventorsGiulio Bottari, Diego Caviglia, Daniele Ceccarelli
Life of this patent
Estimating the term…
Loading patent…
AssigneeTelefonaktiebolaget LM Ericsson (publ)
InventorsGiulio Bottari, Diego Caviglia, Daniele Ceccarelli
Estimating the term…
Recovery from failure of a working path for communications traffic in a connection-oriented network, where the working path has a preplanned recovery path, involves initiating recovery by requesting computation of a new recovery path for the communications traffic to avoid the failure. If the recovery is not successful within a time limit, recovery is carried out using the preplanned recovery path. Determining if the recovery is not successful and initiating the recovery using the preplanned recovery path can be controlled by an ingress node of the working path. By trying to compute a new recovery path first, network resources can be used more efficiently, as the new recovery path is likely to reuse most of the working path, since it is computed knowing the location of the fault.
A method of recovering from failure of a working path for communications traffic in a connection-oriented network, wherein the working path has a preplanned recovery path, the method comprising steps of:
A node for a connection-oriented network, wherein the network being arranged to recover from failure of a working path for communications traffic in the network, wherein the working path has a preplanned recovery path, the node comprising:
A centralised recovery management part for a connection-oriented network, the network being arranged to recover from failure of a working path for communications traffic in the network, wherein the working path has a preplanned recovery path, and the centralised recovery management part comprising:
A nontransitory computer readable medium comprising a computer program comprising machine-readable instructions which when executed by a processor cause the processor to perform a method of recovering from failure of a working path for communications traffic in a connection-oriented network, wherein the working path has a preplanned recovery path, the method comprising:
Dependencies are inferred from the claim text.