Method for operating an industrial controller and industrial controller
AssigneeSiemens Aktiengesellschaft
InventorsThomas Grosch, Jan Richter
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiemens Aktiengesellschaft
InventorsThomas Grosch, Jan Richter
Estimating the term…
Regarding a method for operating an industrial controller, a control program executable in a processor that is arranged in the industrial controller is subdivided into a main block and several program blocks. The program blocks are processed under event control that takes a processing priority into consideration. The processor includes a multi-core processor having a plurality of independent sub-processors. The method includes assigning the main block to a first sub-processor, and executing a part program associated with the main block in the first sub-processor. The method also includes assigning each of the several program blocks to the additional sub-processors, and executing the part programs associated with the program blocks in the respective sub-processors. The method further includes operating a control device to evaluate as input variables the processing priority and an event assigned to the respective program block, and switching the sub-processors into active or inactive state using the evaluation.
A method for operating an industrial controller, a control program executable in a processor arranged in the industrial controller being subdivided into a main block and several program blocks, the program blocks being processed under event control that takes a processing priority into consideration, and the processor including a multi-core processor having a plurality of independent sub-processors, the method comprising:
An industrial controller comprising:
A method for operating an industrial controller, a control program executable in a processor arranged in the industrial controller being subdivided into a main block and several program blocks, the program blocks being processed under event control that takes a processing priority into consideration, and the processor including a multi-core processor having a plurality of independent sub-processors, the method comprising:
Dependencies are inferred from the claim text.