Method of operating a wind park
AssigneeSiemens Aktiengesellschaft
InventorsBo Yin, Bjorn Andresen, Michael Stoettrup, Robert J. Nelson, Per Egedal
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiemens Aktiengesellschaft
InventorsBo Yin, Bjorn Andresen, Michael Stoettrup, Robert J. Nelson, Per Egedal
Estimating the term…
A method of operating a wind park having a plurality of wind turbines is provided. The method includes determining a grid condition indicator indicative of the condition of a grid into which the wind park feeds; determining a first maximum power value of the wind park on the basis of the grid condition indicator; determining an operating margin on the basis of the grid condition indicator, for a grid condition indicator indicative of a weak grid; determining a second maximum power value on the basis of the operating margin; and curtailing the active power output of the wind park according to a maximum power value. A computer program product for carrying out the steps of such a method; an active power controller adapted for use in operating a wind turbine of a wind park; a wind turbine; and a wind park are also provided.
A method of operating a wind park comprising a plurality of wind turbines, which method comprises:
An active power controller adapted for use in operating a wind turbine of a wind park, which controller programmed to:
Dependencies are inferred from the claim text.