# US 9,533,429 B2 · System and process for mixing concrete having desired strength characteristics

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,533,429 B2
- Document ID: US9533429B2
- Status: Granted
- Kind: B2
- Application number: 13/834,544
- Filed: 2013-03-15
- Published: 2014-08-28
- Granted: 2017-01-03
- Earliest claimed: 2013-02-27
- Assignees: Command Alkon Incorporated
- Applicants: Command Alkon Incorporated
- Inventors: Robert W. Phares; Charlene Hohl
- Web page: https://patentgrep.com/patent/US9533429B2

## CPC

- B28C 7/02: Controlling the operation of the mixing
- B28C 7/0422: {Weighing predetermined amounts of ingredients, e.g. for consecutive delivery}
- B28C 9/0409: {and broken-down for transport (B28C9/0445 takes precedence)}
- C04B 40/0032: {Controlling the process of mixing, e.g. adding ingredients in a quantity depending on a measured or desired value (B28C7/00 takes precedence)}
- B28C: PREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER (preparing material for foundry moulds B22C5/00)
- C04B: LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE {(roofing granules E04D7/005)}; CERAMICS (devitrified glass-ceramics C03C10/00); REFRACTORIES; TREATMENT OF NATURAL STONE

## Abstract

A method and system for system for rapidly determining the predicted strength of concrete prior to pouring the concrete is disclosed herein. The system and process provides for a database storing concrete family characteristics that may be updated as actual strength of poured concrete is determined. The process also allows construction workers to pour concrete with a keener knowledge of the resulting concrete strength.

## Claims

### Claim 1

A process for mixing a concrete batch to meet or exceed a predetermined compressive strength, the process comprising:
a. recording an amount of water and an amount of cement added to the batch during mixing at a concrete plant;
b. transmitting the amount of water added and amount of cement added to a processor;
c. transferring the concrete batch to a concrete truck;
d. adding an amount of water or an amount of cement to the concrete batch while the concrete batch is in the truck;
e. transmitting to the processor the amount of water and amount of cement added while the concrete batch is in the truck;
f. prior to pouring the concrete, calculating from the added water weight and added cement weight a batch water-to-cement ratio with the aid of the processor;
g. prior to pouring the concrete, correlating the batch water-to-cement ratio to a predicted concrete strength, according to a database of concrete family characteristics including calculated water-to-cement ratios and actual concrete strengths; and
h. prior to pouring the concrete, providing a notification of the predicted concrete strength.

### Claim 2 (depends on 1)

The process of claim 1, further comprising after providing a notification and prior to pouring the concrete, the step of adding a quantity of water to the concrete batch to result in a revised water-to-cement ratio, correlating the revised water-to-cement ratio to a revised predicted concrete strength, and providing notification of the revised predicted concrete strength.

### Claim 3 (depends on 1)

The process of claim 1, further comprising after the step of providing a notification and prior to pouring the concrete, the step of adding cement to the concrete batch to result in a revised water-to-cement ratio, correlating the revised water-to-cement ratio to a revised predicted concrete strength, and providing notification of the revised predicted concrete strength.

### Claim 4 (depends on 1)

The process of claim 1, where the recording of either the amount of water added or the amount of cement added is performed constantly.

### Claim 5 (depends on 1)

The process of claim 1, where the recording of either the amount of water added or the amount of cement added is performed periodically.

### Claim 6 (depends on 1)

The process of claim 1, where the recording of either the amount of water added or amount of cement added is entered by a user.