Dam construction method utilizing refrigeration technique
AssigneeJu Yang
InventorsJu Yang, Guan Yang
Life of this patent
Estimating the term…
Loading patent…
AssigneeJu Yang
InventorsJu Yang, Guan Yang
Estimating the term…
A dam construction method utilizing refrigerating technology is provided, the method takes natural water as the material to construct the dam and constructs an ice dam body by utilizing the refrigerating technology. The method includes the following steps: choosing the forms and quantity of ice unit bodies, determining the positions and quantity of frozen contact points, manufacturing sufficient ice unit bodies by frozen units, choosing heat insulating material with high performance as the heat preservation layer to cover on the outside of the frozen ice unit bodies; temporarily fixing the ice unit bodies; quickly freezing the seams of the ice unit bodies to form a whole ice dam; mounting temporary generating equipment and completing the temporary dam body; thawing the ice dam body after a permanent dam body is completed.
A method of dam construction utilizing freezing technique, the method utilizing a natural water body as dam material and utilizing a freezing technique to construct an ice dam body, the method comprising the following steps:
Dependencies are inferred from the claim text.