Conveyor belt with zero stage splice
AssigneeContiTech Transport band systeme GMBH
InventorsDouglas M. Gilg, Robin B. Steven, Shannon G. Willer, David J. Maguire
Life of this patent
Estimating the term…
Loading patent…
AssigneeContiTech Transport band systeme GMBH
InventorsDouglas M. Gilg, Robin B. Steven, Shannon G. Willer, David J. Maguire
Estimating the term…
The present invention is based upon the discovery that the steel cords in conveyor belt splices can be brazed together in a specific and cost effective manner to attain splices which having improved strength and durability. The present invention more specifically discloses a conveyor belt which is reinforced with steel cables and which includes a first section and a second section which are bonded together with a splice, wherein said splice bonds a first set of steel cables from the first section of the conveyor belt to a second set of steel cables from the second section of the conveyor belt with a braze alloy, and wherein the first set of steel cables and the second set of steel cables are contained within a ferrule at the point of where the first set of steel cables are bonded to the second set of steel cables.
A conveyor belt which is comprised of a carry cover layer, pulley cover layer, and a reinforcement ent er which is situated between the carry cover layer and the pulley cover layer, wherein the reinforcement layer is reinforced with steel cables, wherein the conveyor belt includes a first section and a second section which are bonded together with a splice, wherein said splice bonds a first set of steel cables from the first section of the conveyor belt to a second set of steel cables from the second section of the conveyor belt with a braze alloy, and wherein the first set of steel cables and the second set of steel cables are contained within a ferrule at the point of where the first set of steel cables are bonded to the second set of steel cables in the reinforcement layer of the conveyor belt.
A method for connecting a steel cable in a splice between a first segment of a conveyor belt and a second segment of the conveyor belt, said method comprising:
Dependencies are inferred from the claim text.