Stepwise repeated destabilization and stabilization of highly collapsible soil mass by ‘soil nailing technique’ used for construction of railway/road underpass
AssigneeCouncil of Scientific and Industrial Research
InventorsKanwar Singh, Pulikanti Subramanya Prasad, Sudhir Mathur, Farhat Azad, Subhamay Gangopadhyay
Life of this patent
Estimating the term…