# US 9,357,513 B2 · User equipment reallocation between nodes

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,357,513 B2
- Document ID: US9357513B2
- Status: Granted
- Kind: B2
- Application number: 14/332,661
- Filed: 2014-07-16
- Published: 2015-02-12
- Granted: 2016-05-31
- Earliest claimed: 2013-08-08
- Assignees: Intel IP Corporation
- Applicants: Intel IP Corporation
- Inventors: Vadim Sergeyev; Jong-Kae Fwu; Alexei Davydov
- Web page: https://patentgrep.com/patent/US9357513B2

## CPC

- H04W 24/02: Arrangements for optimising operational condition
- E04G 23/0218: {Increasing or restoring the load-bearing capacity of building construction elements (E04G23/0203 and E04G23/0266 take precedence)}
- E04H 9/025: {Structures with concrete columns}
- H04B 7/0617: {for beam forming}
- H04B 7/0626: {Channel coefficients, e.g. channel state information [CSI]}
- H04B 7/0639: {Using selective indices, e.g. of a codebook, e.g. pre-distortion matrix index [PMI] or for beam selection}
- H04L 1/1812: Hybrid protocols; Hybrid automatic repeat request [HARQ]
- H04L 5/0058: {Allocation criteria}
- H04L 5/006: {Quality of the received signal, e.g. BER, SNR, water filling}
- H04L 5/14: Two-way operation using the same type of signal, i.e. duplex
- H04W 4/70: Services for machine-to-machine communication [M2M] or machine type communication [MTC]
- H04W 8/02: Processing of mobility data, e.g. registration information at HLR [Home Location Register] or VLR [Visitor Location Register]; Transfer of mobility data, e.g. between HLR, VLR or external networks
- H04W 16/26: Cell enhancers {or enhancement}, e.g. for tunnels, building shadow
- H04W 24/10: Scheduling measurement reports {; Arrangements for measurement reports}
- H04W 36/08: Reselecting an access point
- H04W 36/165: {for reducing network power consumption (H04W36/18 - H04W36/22 take precedence)}
- H04W 36/28: involving a plurality of connections, e.g. multi-call or multi-bearer connections
- H04W 48/16: Discovering, processing access restriction or access information
- H04W 52/0206: {in access points, e.g. base stations}
- H04W 52/0209: {in terminal devices}
- H04W 52/0219: {where the power saving management affects multiple terminals}
- H04W 56/0005: {synchronizing of arrival of multiple uplinks}
- H04W 64/006: {with additional information processing, e.g. for direction or speed determination}
- H04W 72/0446: Resources in time domain, e.g. slots or frames
- H04W 72/20: Control channels or signalling for resource management
- H04W 72/541: using the level of interference
- H04W 76/10: Connection setup
- H04W 76/14: Direct-mode setup
- H04W 76/27: Transitions between radio resource control [RRC] states
- H04B 7/0452: Multi-user MIMO systems
- H04L 5/0048: {Allocation of pilot signals, i.e. of signals known to the receiver (allocation of control signalling H04L5/0053; use of control signalling H04L5/0091)}
- H04L 5/0053: {Allocation of signalling, i.e. of overhead other than pilot signals}
- H04L 5/1469: {using time-sharing}
- H04W 4/023: {using mutual or relative location information between multiple location based services [LBS] targets or of distance thresholds}
- H04W 36/14: Reselecting a network or an air interface
- H04W 48/12: using downlink control channel
- H04W 88/02: Terminal devices
- H04W 88/04: adapted for relaying to or from another terminal or user
- H04W 88/08: Access point devices
- Y02D 30/70: in wireless communication networks
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04H: BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL (foundations E02D)
- H04B: TRANSMISSION
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A technology for a power management module that is operable to reduce power consumption in a communications network. A resource availability of one or more evolved node B (eNode Bs) in the communications network can be determine to receive data traffic of a plurality of user equipment (UEs) in communication with a serving eNode B. A power consumption rate of the communications network can be calculated when the serving eNode B is placed in a power saving mode. The serving eNode B can be switched to a power savings mode when the resource availability of the one or more eNode Bs enables the plurality of UEs to be handed over from the serving eNode B to selected eNode Bs of the one or more eNode Bs.

## Claims

### Claim 1

A network device configured to reduce power consumption in a communications network, the network device having computer circuitry configured to:
select a first evolved node B (eNode B) for power consumption reduction;
determine that a second eNode B has available resources to communicate data traffic of a user equipment (UE) in communication with the first eNode B;
calculate a power consumption rate of the communications network when a first eNode B is placed in a power savings mode;
handover the UE to the second eNode B based on a reduction in the power consumption rate of the communications network; and
switch the first eNode B to the power savings mode when the UE is handed over to the second eNode B.

### Claim 2 (depends on 1)

The computer circuitry of claim 1, further configured to calculate the power consumption rate of the communications network by comparing an amount of power consumed by the communications network before UE traffic is reallocated to the second eNode B with an amount of power consumed by the communications network after UE traffic is reallocated to the second eNode B and the first eNode B is switched to power savings mode.

### Claim 3 (depends on 1)

The computer circuitry of claim 1, further configured to determine a data rate of the UE when the UE is reallocated to the second eNode B.

### Claim 4 (depends on 3)

The computer circuitry of claim 3, further configured to handover the UE when:
the data rate of the UE remains within a selected threshold range when the UE is handed over to the second eNode B; and
the power consumption rate of the communications network decreases by at least a threshold amount.

### Claim 5 (depends on 1)

The computer circuitry of claim 1, further configured to continue to maintain the UE connection with the first eNode B when the calculated power consumption rate of the communications network remains above a selected threshold rate.

### Claim 6 (depends on 1)

The computer circuitry of claim 1, further configured to turn off the first eNode B or switch the first eNode B to a sleep mode when the first eNode B enters the power savings mode.

### Claim 7 (depends on 6)

The computer circuitry of claim 6, wherein the sleep mode is a minimum power operating level of the first eNode B.

### Claim 8

An power management module configured to reduce power consumption in a communications network, the power consumption module having computer circuitry configured to:
determine a resource availability of one or more evolved node B (eNode Bs) in the communications network to receive data traffic of a plurality of user equipment (UEs) in communication with a serving eNode B;
calculate a power consumption rate of the communications network when the serving eNode B is placed in a power saving mode; and
switch the serving eNode B to a power savings mode when the resource availability of the one or more eNode Bs enables the plurality of UEs to be handed over from the serving eNode B to selected eNode Bs of the one or more eNode Bs.

### Claim 9 (depends on 8)

The computer circuitry of claim 8, further configured to calculate the power consumption rate of the communications network by comparing an amount of power consumed by the communications network before the serving eNode B is placed in the power saving mode with an amount of power consumed by the network after the serving eNode B is placed in the power saving mode.

### Claim 10 (depends on 9)

The computer circuitry of claim 9, further configured to:
calculate the amount of power consumed by the communications network before the serving eNode B is placed in the power saving mode using:
∑
i
=
1
N
-
1
⁢
P
0
,
i
+
(
∑
i
=
1
N
⁢
χ
i
⁢
Δ
p
,
i
⁢
P
max
,
i
)
+
P
0
,
serv
,
wherein N is a number of eNode Bs in the communications network, P0,serv is an amount of power consumed by the serving eNode B when the serving eNode B is operating and not communicating data, P0,i an amount of power consumed by an ith eNode B when the ith eNode B is operating and not communicating data, χi is an amount of time-frequency resources the ith eNode B uses to communicate with a plurality of UEs, Δp,i is an amount of power the ith eNode B draws from a power source per unit of power transmitted by the ith eNode B, and Pmax,i is a maximum amount of power transmitted by the ith eNode B when the ith eNode B is using all the resources of the eNode B to communicate with the plurality of UEs; and
calculate the amount of power consumed by the communications network after the serving eNode B is placed in the power saving mode using:
∑
i
=
1
N
-
1
⁢
P
0
,
i
+
(
∑
i
=
1
N
-
1
⁢
χ
i
,
new
⁢
Δ
p
,
i
⁢
P
max
,
i
)
+
P
sleep
,
wherein χi,new is an amount of time-frequency resources the ith eNode B uses to communicate with the plurality of UEs after the plurality of UEs is handed over from the serving eNode B to the one or more eNode Bs and Psleep is an amount of power consumed by the serving eNode B when operating in a sleep mode.

### Claim 11 (depends on 10)

The computer circuitry of claim 10, wherein the serving eNode B is the Nth eNode B of the N eNode Bs in the communications network.

### Claim 12 (depends on 10)

The computer circuitry of claim 10, further configured to determine a change in power consumption of the communications network using P0,serv−Psleep when the serving eNode B is switched to the power saving mode.

### Claim 13 (depends on 8)

The computer circuitry of claim 8, further configured to reallocate the data traffic of the plurality of UEs from the serving eNode B to the one or more eNode Bs in the communications network when:
a data rate of each UE in the plurality of UEs remains within a selected threshold range when each UE is reallocated to the one or more eNode Bs; and
the power consumption rate of the communications network decreases by at least a threshold amount.

### Claim 14 (depends on 8)

The computer circuitry of claim 8, wherein the one or more eNode Bs are small cell eNode Bs and the serving eNode B is a small cell eNode B.

### Claim 15

A product including a non-transitory storage medium having stored thereon instructions that are adapted to be executed to implement a method of reducing power consumption of a communications network, the method comprising:
determining resource availability of evolved node Bs (eNode Bs) in the communications network to receive data traffic of a plurality of user equipment (UEs) in communication with a selected eNode B in the communications network;
calculating a power consumption rate of the communications network when the selected eNode B is placed in a power saving mode; and
switching the selected eNode B to the power savings mode when the resource availability of the eNode Bs in the communications network enables the plurality of UEs to be handed over from the selected eNode B to the eNode Bs in the communications network.

### Claim 16 (depends on 15)

The product of claim 15, the method further comprising calculating the power consumption rate of the communications network by comparing an amount of power consumed by the communications network before the selected eNode B is placed in the power saving mode with an amount of power consumed by the network after the selected eNode B is placed in the power saving mode.

### Claim 17 (depends on 15)

The product of claim 15, the method further comprising handing over the plurality of UEs to the eNode Bs based on a reduction in the power consumption rate of the communications network.

### Claim 18 (depends on 17)

The product of claim 17, the method further comprising handing over the plurality of UEs from the selected eNode B to the eNode Bs in the communications network when:
a data rate of each UE in the plurality of UEs remains within a selected threshold range when each UE is reallocated to the eNode Bs; and
the power consumption rate of the communications network decreases by at least a threshold amount.

### Claim 19 (depends on 15)

The product of claim 15, the method further comprising maintaining the UE connection with the selected eNode B when the calculated power consumption rate of the communications network remains above a selected threshold rate.

### Claim 20 (depends on 15)

The product of claim 15, the method further comprising dynamically handing over the plurality of UEs to the eNode Bs based on a reduction in the power consumption rate of the communications network to continuously reduce the power consumption rate of the communications network.

### Claim 21 (depends on 15)

The product of claim 15, the method further comprising:
calculating the amount of power consumed by the network before the selected eNode B is placed in the power saving mode using:
∑
i
=
1
N
-
1
⁢
P
0
,
i
+
(
∑
i
=
1
N
⁢
χ
i
⁢
Δ
p
,
i
⁢
P
max
,
i
)
+
P
0
,
serv
,
wherein N is a number of eNode Bs in the communications network, P0,serv is an amount of power consumed by the serving eNode B when the serving eNode B is operating and not communicating data, P0,i an amount of power consumed by an ith eNode B when the ith eNode B is operating and not communicating data, χi is an amount of time-frequency resources the ith eNode B uses to communicate with a plurality of UEs, Δp,i is an amount of power the ith eNode B draws from a power source per unit of power transmitted by the ith eNode B, and Pmax,i is a maximum amount of power transmitted by the ith eNode B when the ith eNode B is using all the resources of the eNode B to communicate with the plurality of UEs; and
calculating the amount of power consumed by the network after the selected eNode B is placed in the power saving mode using:
∑
i
=
1
N
-
1
⁢
P
0
,
i
+
(
∑
i
=
1
N
-
1
⁢
χ
i
,
new
⁢
Δ
p
,
i
⁢
P
max
,
i
)
+
P
sleep
,
wherein χi,new is an amount of time-frequency resources the ith eNode B uses to communicate with the plurality of UEs after the plurality of UEs is handed over from the serving eNode B to the one or more eNode Bs and Psleep is an amount of power consumed by the serving eNode B when operating in a sleep mode.

### Claim 22 (depends on 21)

The product of claim 21, wherein the serving eNode B is the Nth eNode B of the N eNode Bs in the communications network.
