# US 9,357,510 B2 · Power sharing and power headroom reporting in dual connectivity scenarios

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,357,510 B2
- Document ID: US9357510B2
- Status: Granted
- Kind: B2
- Application number: 14/671,364
- Filed: 2015-03-27
- Published: 2015-10-01
- Granted: 2016-05-31
- Earliest claimed: 2014-03-31
- Assignees: QUALCOMM Incorporated
- Applicants: QUALCOMM Incorporated
- Inventors: Jelena Damnjanovic; Wanshi Chen; Aleksandar Damnjanovic; Peter Gaal
- Web page: https://patentgrep.com/patent/US9357510B2

## CPC

- H04W 52/365: {Power headroom reporting}
- H04W 52/146: {Uplink power control}
- H04W 52/32: TPC of broadcast or control channels
- H04W 52/34: TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
- H04W 52/367: {Power values between minimum and maximum limits, e.g. dynamic range}
- H04W 52/38: TPC being performed in particular situations
- H04W 72/0446: Resources in time domain, e.g. slots or frames
- H04W 72/21: in the uplink direction of a wireless link, i.e. towards the network
- H04W 76/27: Transitions between radio resource control [RRC] states
- H04W 88/12: Access point controller devices
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Certain aspects of the present disclosure provide procedures for power sharing, scaling, and power headroom reporting in dual connectivity operations. According to certain aspects, a method of wireless communication by a user equipment (UE) is provided. The method generally includes determining a maximum available transmit power of the UE, semi-statically configuring a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station, and dynamically determining a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the UE, the first minimum guaranteed power, and the second minimum guaranteed power.

## Claims

### Claim 1

A method for wireless communication by a user equipment (UE), comprising:
determining a maximum available transmit power of the UE;
semi-statically configuring a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station; and
dynamically determining a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the UE, the first minimum guaranteed power, and the second minimum guaranteed power, wherein dynamically determining the first maximum transmit power and the second maximum transmit power comprises:
determining an amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station, and
including at least a portion of the unused amount when determining the second maximum transmit power available for uplink transmission to the second base station.

### Claim 2 (depends on 1)

The method of claim 1, wherein the semi-static configuring is via radio resource control (RRC) signaling.

### Claim 3 (depends on 1)

The method of claim 1, wherein the unused amount comprises an amount of the first minimum guaranteed power that is unused for transmission to the first base station on all uplink channels to be transmitted to the first base station.

### Claim 4 (depends on 1)

The method of claim 1, wherein the first base station and the second base station operate asynchronously, and wherein dynamically determining the first maximum transmit power and the second maximum transmit power comprises:
determining a first amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station during a first transmission time interval (TTI);
determining a second amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station during a second TTI overlapping the first TTI; and
including at least a portion of the smaller of the first unused amount or the second unused amount when determining the second maximum transmit power.

### Claim 5 (depends on 1)

The method of claim 1, wherein the first base station comprises a Master Evolved Node B (MeNB) or a Secondary eNB (SeNB) and the second base station comprises the other one of a MeNB or a SeNB.

### Claim 6 (depends on 1)

The method of claim 1, wherein the semi-static configuring is based on a prioritization.

### Claim 7 (depends on 6)

The method of claim 6, wherein the prioritization comprises allocating transmit power, in order of higher priority to lower priority, to: a physical uplink control channel (PUCCH), a physical uplink shared channel (PUSCH) with uplink control information (UCI), and a PUSCH without UCI.

### Claim 8 (depends on 6)

The method of claim 6, wherein the prioritization comprises allocating transmit power with a higher priority to channels for a Master Evolved Node B (MeNB) and with a lower priority to corresponding channels for a Secondary eNB (SeNB).

### Claim 9 (depends on 6)

The method of claim 6, wherein the prioritization comprises allocating transmit power, in order of higher priority to lower priority, to: a physical uplink control channel (PUCCH) for a Master Evolved Node B (MeNB), a PUCCH for a Secondary eNB (SeNB), a physical uplink shared channel (PUSCH) with uplink control information (UCI) for a MeNB, a PUSCH with UCI for a SeNB, and a PUSCH without UCI.

### Claim 10 (depends on 6)

The method of claim 6, wherein the prioritization comprises allocating transmit power with a higher priority to a physical uplink shared channel (PUSCH) that carries traffic with a higher grade of service and with a lower priority to a PUSCH that carries traffic with a lower grade of service.

### Claim 11 (depends on 6)

The method of claim 6, wherein the prioritization comprises uniformly distributing power for physical uplink shared channel (PUSCH) transmissions to the first base station and the second base station.

### Claim 12 (depends on 1)

The method of claim 1, further comprising:
sending a power headroom report (PHR) to at least one of the first base station or the second base station indicating at least one of the first maximum transmit power or the second maximum transmit power.

### Claim 13

An apparatus for wireless communications, comprising:
at least one processor configured to:
determine a maximum available transmit power of the apparatus,
semi-statically configure a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station, and
dynamically determine a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the apparatus, the first minimum guaranteed power, and the second minimum guaranteed power, wherein dynamically determining the first maximum transmit power and the second maximum transmit power comprises:
determining an amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station, and
including at least a portion of the unused amount when determining the second maximum transmit power available for uplink transmission to the second base station; and
a memory coupled with the at least one processor.

### Claim 14 (depends on 13)

The apparatus of claim 13, wherein the semi-static configuring is via radio resource control (RRC) signaling.

### Claim 15 (depends on 13)

The apparatus of claim 13, wherein the unused amount comprises an amount of the first minimum guaranteed power that is unused for transmission to the first base station on all uplink channels to be transmitted to the first base station.

### Claim 16 (depends on 13)

The apparatus of claim 13, wherein the first base station and the second base station operate asynchronously, and wherein dynamically determining the first maximum transmit power and the second maximum transmit power comprises:
determining a first amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station during a first transmission time interval (TTI);
determining a second amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station during a second TTI overlapping the first TTI; and
including at least a portion of the smaller of the first unused amount or the second unused amount when determining the second maximum transmit power.

### Claim 17 (depends on 13)

The apparatus of claim 13, wherein the first base station comprises a Master Evolved Node B (MeNB) or a Secondary eNB (SeNB) and the second base station comprises the other one of a MeNB or a SeNB.

### Claim 18 (depends on 13)

The apparatus of claim 13, wherein the semi-static configuring is based on a prioritization.

### Claim 19 (depends on 18)

The apparatus of claim 18, wherein the prioritization comprises allocating transmit power, in order of higher priority to lower priority, to: a physical uplink control channel (PUCCH), a physical uplink shared channel (PUSCH) with uplink control information (UCI), and a PUSCH without UCI.

### Claim 20 (depends on 18)

The apparatus of claim 18, wherein the prioritization comprises allocating transmit power with a higher priority to channels for a Master Evolved Node B (MeNB) and with a lower priority to corresponding channels for a Secondary eNB (SeNB).

### Claim 21 (depends on 18)

The apparatus of claim 18, wherein the prioritization comprises allocating transmit power, in order of higher priority to lower priority, to: a physical uplink control channel (PUCCH) for a Master Evolved Node B (MeNB), a PUCCH for a Secondary eNB (SeNB), a physical uplink shared channel (PUSCH) with uplink control information (UCI) for a MeNB, a PUSCH with UCI for a SeNB, and a PUSCH without UCI.

### Claim 22 (depends on 18)

The apparatus of claim 18, wherein the prioritization comprises allocating transmit power with a higher priority to a physical uplink shared channel (PUSCH) that carries traffic with a higher grade of service and with a lower priority to a PUSCH that carries traffic with a lower grade of service.

### Claim 23 (depends on 18)

The apparatus of claim 18, wherein the prioritization comprises uniformly distributing power for physical uplink shared channel (PUSCH) transmissions to the first base station and the second base station.

### Claim 24 (depends on 13)

The apparatus of claim 13, further comprising:
sending a power headroom report (PHR) to at least one of the first base station or the second base station indicating at least one of the first maximum transmit power or the second maximum transmit power.

### Claim 25

An apparatus for wireless communication by a user equipment (UE), comprising:
means for determining a maximum available transmit power of the UE;
means for semi-statically configuring a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station; and
means for dynamically determining a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the UE, the first minimum guaranteed power, and the second minimum guaranteed power, wherein means for dynamically determining the first maximum transmit power and the second maximum transmit power comprises:
means for determining an amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station, and
means for including at least a portion of the unused amount when determining the second maximum transmit power available for uplink transmission to the second base station.

### Claim 26

A non-transitory computer readable medium having computer executable code stored there, the computer executable code comprising:
code for determining a maximum available transmit power of the UE;
code for semi-statically configuring a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station; and
code for dynamically determining a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the UE, the first minimum guaranteed power, and the second minimum guaranteed power, wherein code for dynamically determining the first maximum transmit power and the second maximum transmit power comprises:
code for determining an amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station, and
code for including at least a portion of the unused amount when determining the second maximum transmit power available for uplink transmission to the second base station.
