# US 9,356,808 B2 · System and method for adaptive channel estimation based on data activity

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,356,808 B2
- Document ID: US9356808B2
- Status: Granted
- Kind: B2
- Application number: 14/496,969
- Filed: 2014-09-25
- Published: 2015-03-26
- Granted: 2016-05-31
- Earliest claimed: 2013-09-25
- Assignees: Apple Inc.
- Applicants: Apple Inc.
- Inventors: Navid Damji; Tarik Tabet; Johnson Sebeni; Syed Aon Mujtaba
- Web page: https://patentgrep.com/patent/US9356808B2

## CPC

- H04L 25/0228: {with direct estimation from sounding signals}
- H04L 25/024: {channel estimation algorithms}
- H04W 52/0229: {where the received signal is a wanted signal}
- H04W 52/0245: {according to signal strength}
- H04L 5/0023: {Time-frequency-space}
- H04L 5/0048: {Allocation of pilot signals, i.e. of signals known to the receiver (allocation of control signalling H04L5/0053; use of control signalling H04L5/0091)}
- Y02D 30/70: in wireless communication networks
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A station performing a method to toggle a channel estimation setting between a full channel estimation that includes estimating the channel based upon a predetermined number of received reference symbols prior to a current subframe and a partial channel estimation that includes estimating the channel based upon a subset of the predetermined number of received reference symbols. The method includes changing the setting from full to partial when a predetermined number of consecutive subframes immediately prior to the current subframe had no downlink allocated and a reliability value indicates that control signals are capable of being reliably received. The method also includes changing the setting from partial to full when the current subframe had a downlink allocated thereto or the reliability value indicates that the control signals are incapable of being received to estimate the channel using the partial channel estimation.

## Claims

### Claim 1

A method, comprising:
at a station:
determining a setting to perform a channel estimation, the setting being one of a full channel estimation and a partial channel estimation, the full channel estimation including estimating the channel based upon a predetermined number of received reference symbols prior to a current subframe, the partial channel estimation including estimating the channel based upon a subset of the predetermined number of received reference symbols;
changing the setting from the full channel estimation to the partial channel estimation when a predetermined number of consecutive subframes immediately prior to the current subframe had no downlink allocated thereto and a reliability value indicates that control signals are capable of being received to estimate the channel using the partial channel estimation; and
changing the setting from the partial channel estimation to the full channel estimation when one of the current subframe had a downlink allocated thereto or the reliability value indicates that the control signals are incapable of being received to estimate the channel using the partial channel estimation.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
performing a full channel estimation when the setting is a full channel estimation setting; and
performing a partial channel estimation when the setting is a partial channel estimation setting.

### Claim 3

A method, comprising:
at a station:
determining a channel estimation setting for the station;
determining, when the channel estimation setting is a full channel estimation setting, whether a downlink has been allocated for a predetermined number of subframes prior to a current subframe, wherein a full channel estimation includes estimating the channel based upon a predetermined number of received reference symbols prior to the current subframe;
calculating a reliability value for a channel for which channel estimation is to be performed; and
changing the channel estimation setting to a partial channel estimation setting when no downlink has been allocated for the predetermined number of subframes prior to the current subframe or the reliability value meets a predetermined criteria, wherein partial channel estimation includes estimating the channel based upon a subset of the predetermined number of received reference symbols.

### Claim 4 (depends on 3)

The method of claim 3, further comprising:
performing a partial channel estimation for the channel when the channel estimation setting is set to the partial channel estimation setting.

### Claim 5 (depends on 3)

The method of claim 3, further comprising:
maintaining the channel estimation setting as the full channel estimation setting when the downlink has been allocated for the predetermined number of subframes prior to the current subframe or the reliability value fails to meet the predetermined criteria; and
performing a full channel estimation for the channel when the channel estimation setting is set to the full channel estimation setting.

### Claim 6 (depends on 3)

The method of claim 3, further comprising:
determining, when the channel estimation setting is a partial channel estimation setting, whether a downlink has been allocated to the current subframe;
calculating, when the downlink has not been allocated to the current subframe, the reliability value for the channel; and
maintaining the partial channel estimation setting when the reliability value meets the predetermined criteria.

### Claim 7 (depends on 6)

The method of claim 6, further comprising:
changing the channel estimation setting to a full channel estimation setting when the downlink has been allocated to the immediately prior subframe or the reliability value fails to meet the predetermined criteria.

### Claim 8 (depends on 3)

The method of claim 3, further comprising:
setting the channel estimation setting to a predetermined setting.

### Claim 9 (depends on 3)

The method of claim 3, wherein the channel is a Physical Downlink Control Channel (PDCCH).

### Claim 10 (depends on 3)

The method of claim 3, wherein the predetermined number of subframes corresponds to a number of subframes for a maximum roundtrip delay in network traffic.

### Claim 11 (depends on 3)

The method of claim 3, wherein the predetermined number of subframes corresponds to an inter-arrival time between packets within a packet session.

### Claim 12 (depends on 3)

The method of claim 3, wherein the reliability value is calculated based on one of a received signal to noise ratio, a received signal strength/signal quality, a channel quality indicator/rank for the channel.

### Claim 13 (depends on 3)

The method of claim 3, wherein the predetermined number of subframes is related to an application being executed by the station.

### Claim 14

A station, comprising:
a transceiver configured to establish a connection to a network, the transceiver further configured to receive reference symbols from the network; and
a processor coupled to a memory, wherein the processor is programmed to determine a channel estimation setting to perform a channel estimation, the setting being one of a full channel estimation and a partial channel estimation, the full channel estimation including estimating the channel based upon a predetermined number of received reference symbols prior to a current subframe, the partial channel estimation including estimating the channel based upon a subset of the predetermined number of received reference symbols, the processor being programmed to:
determine a current channel estimation setting for the station;
determine, when the current channel estimation setting is a full channel estimation setting, whether a downlink has been allocated for a predetermined number of subframes prior to a current subframe;
calculate a reliability value for a channel for which channel estimation is to be performed; and
change the current channel estimation setting to a partial channel estimation setting when no downlink has been allocated for the predetermined number of subframes prior to the current subframe or the reliability value meets a predetermined criteria.

### Claim 15 (depends on 14)

The station of claim 14, wherein the processor is further programmed to:
perform a partial channel estimation for the channel when the current channel estimation setting is set to the partial channel estimation setting.

### Claim 16 (depends on 14)

The station of claim 14, wherein the processor is further programmed to:
maintain the current channel estimation setting as the full channel estimation setting when the downlink has been allocated for the predetermined number of subframes prior to the current subframe or the reliability value fails to meet the predetermined criteria; and
perform a full channel estimation for the channel when the current channel estimation setting is set to the full channel estimation setting.

### Claim 17 (depends on 14)

The station of claim 14, wherein the processor is further programmed to:
determine, when the current channel estimation setting is a partial channel estimation setting, whether a downlink has been allocated to the current subframe;
calculate, when the downlink has not been allocated to the current subframe, the reliability value for the channel; and
maintain the partial channel estimation setting when the reliability value meets the predetermined criteria.

### Claim 18 (depends on 17)

The station of claim 17, wherein the processor is further programmed to:
change the current channel estimation setting to a full channel estimation setting when the downlink has been allocated to the current subframe or the reliability value fails to meet the predetermined criteria.

### Claim 19 (depends on 14)

The station of claim 14, wherein the predetermined number of subframes corresponds to one of (i) a number of subframes for a maximum roundtrip delay in network traffic, (ii) to an inter-arrival time between packets within a packet session, or (iii) an application being executed by the station.

### Claim 20 (depends on 14)

The station of claim 14, wherein the reliability value is calculated based on one of a received signal to noise ratio, a received signal strength/signal quality, a channel quality indicator/rank for the channel.
