# US 9,356,531 B2 · Load control device for high-efficiency loads

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,356,531 B2
- Document ID: US9356531B2
- Status: Granted
- Kind: B2
- Application number: 14/844,252
- Filed: 2015-09-03
- Published: 2015-12-31
- Granted: 2016-05-31
- Earliest claimed: 2009-11-25
- Assignees: Lutron Electronics Co., Inc.
- Applicants: Lutron Electronics Co., Inc.
- Inventors: Robert C. Newman, Jr.; Daniel F. Carmen; Christopher J. Salvestrini; Matthew V. Harte
- Web page: https://patentgrep.com/patent/US9356531B2

## CPC

- H02M 1/081: {wherein the phase of the control voltage is adjustable with reference to the AC source}
- H02M 1/088: for the simultaneous control of series or parallel connected semiconductor devices
- H02M 1/32: Means for protecting converters other than automatic disconnection
- H02M 5/2573: {with control circuit}
- H02M 5/293: using semiconductor devices only
- H02M 7/06: using discharge tubes without control electrode or semiconductor devices without control electrode
- H05B 39/04: Controlling
- H05B 39/044: {continuously (H05B39/042 takes precedence)}
- H05B 39/048: {with reverse phase control}
- H05B 45/10: Controlling the intensity of the light
- H05B 45/37: Converter circuits
- H05B 45/3725: Switched mode power supply [SMPS]
- H02M 1/0006: {Arrangements for supplying an adequate voltage to the control circuit of converters}
- H02M 1/0012: {Control circuits using digital or numerical techniques (in DC/DC converters H02M3/157, H02M3/33515; in DC-AC converters H02M7/53873)}
- H05B 45/375: using buck topology
- H05B 45/38: using boost topology
- H05B 45/39: Circuits containing inverter bridges
- Y02B 20/00: Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)
- H05B: ELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS

## Abstract

A load control device for controlling the power delivered from an AC power source to an electrical load includes a thyristor, a first current path for conducting current through a gate terminal of the thyristor, and a control circuit for controlling the first current path to conduct a pulse of current through the gate terminal to render the thyristor conductive at a firing time during a half cycle. The first current path is able to conduct at least one other pulse of current through the gate terminal again after the firing time until, a transition time before the end of the half-cycle, but prevented from conducting pulses of current after the transition time until the end of the half-cycle. The load control device may comprise a second current path for conducting current through the electrical load between the transition time and the end of the half-cycle.

## Claims

### Claim 1

A load control device for controlling power delivered from an AC power source to an electrical load, the load control device comprising:
a thyristor adapted to be electrically coupled between the AC power source and the electrical load, the thyristor having first and second main terminals through which current can be conducted to energize the electrical load and a gate terminal through which current can be conducted to render the thyristor conductive;
a first current path electrically coupled between the first main terminal of the thyristor and the gate terminal of the thyristor to conduct current through the gate terminal of the thyristor;
a control circuit configured to control the first current path to conduct a pulse of current through the gate terminal of the thyristor to render the thyristor conductive at a firing time during a present half-cycle of the AC power source, the control circuit being configured to control the first current path to allow the first current path to conduct at least one other pulse of current through the gate terminal of the thyristor again after the firing time until a transition time before the end of the present half-cycle; and
a second current path electrically coupled between the first and second terminals of the thyristor to conduct current through the electrical load between the transition time and the end of the present half-cycle.

### Claim 2 (depends on 1)

The load control device of claim 1, wherein the first current path includes a gate coupling circuit and a controllable switching circuit electrically coupled in series between the first main terminal of the thyristor and the gate terminal of the thyristor, the gate coupling circuit electrically coupled to the first main terminal of the thyristor, the controllable switching circuit electrically coupled between the gate coupling circuit and the gate terminal of the thyristor.

### Claim 3 (depends on 2)

The load control device of claim 2, wherein the second current path includes the gate coupling circuit and a resistor electrically coupled in series between the first and second main terminals of the thyristor, the gate coupling circuit electrically coupled between the first main terminal of the thyristor and the controllable switching circuit, the resistor electrically coupled between the second main terminal of the thyristor and the junction of the gate coupling circuit and the controllable switching circuit, the resistor configured to conduct current through the electrical load when the thyristor is non-conductive.

### Claim 4 (depends on 3)

The load control device of claim 3, wherein the control circuit is further configured to control the gate coupling circuit and the controllable switching circuit to conduct the pulse of current through the gate terminal of the thyristor at the firing time to render the thyristor conductive, the control circuit being further configured to render the controllable switching circuit non-conductive at the transition time to prevent the gate coupling circuit from conducting pulses of current through the gate terminal of the thyristor between the transition time and the end of the present half-cycle.

### Claim 5 (depends on 4)

The load control device of claim 4, wherein the thyristor is able to commutate off after the control circuit renders the controllable switching circuit non-conductive, the control circuit being further configured to maintain the controllable switching circuit non-conductive until at least the beginning of the next half-cycle of the AC power source, thereby assuring that the thyristor remains non-conductive for the remainder of the present half-cycle after the thyristor commutates off.

### Claim 6 (depends on 5)

The load control device of claim 5, wherein the gate coupling circuit is configured to conduct current through the electrical load between the transition time and the end of the present half-cycle.

### Claim 7 (depends on 3)

The load control device of claim 3, wherein the gate coupling circuit comprises at least one MOS-gated transistor electrically coupled between the first main terminal of the thyristor and the gate terminal of thyristor.

### Claim 8 (depends on 7)

The load control device of claim 7, wherein the gate coupling circuit comprises a single MOS-gated transistor in a full-wave rectifier bridge or two MOS-gated transistors electrically coupled in anti-series connection.

### Claim 9 (depends on 2)

The load control device of claim 2, wherein the controllable switching circuit comprises an optocoupler having an input photodiode electrically coupled to receive a switch control signal from the control circuit and an output phototransistor configured to conduct current through the gate terminal of the thyristor to render the thyristor conductive.

### Claim 10 (depends on 1)

The load control device of claim 1, wherein the first current path includes a gate coupling circuit coupled between the first main terminal of the thyristor and the gate terminal of the thyristor, the control circuit being configured to render the gate coupling circuit conductive to conduct the pulse of current through the gate terminal of the thyristor at the firing time to render the thyristor conductive, the control circuit being further configured to render the gate coupling circuit non-conductive at the transition time.

### Claim 11 (depends on 10)

The load control device of claim 10, wherein the second current path includes a controllable switching circuit electrically coupled in parallel with the main terminals of the thyristor, the control circuit being configured to render the controllable switching circuit conductive between the transition time and the end of the present half-cycle to conduct current through the electrical load.

### Claim 12 (depends on 11)

The load control device of claim 11, wherein the controllable switching circuit comprises at least one MOS-gated transistor.

### Claim 13 (depends on 12)

The load control device of claim 12, wherein the controllable switching circuit comprises a single MOS-gated transistor in a full-wave rectifier bridge.

### Claim 14 (depends on 11)

The load control device of claim 11, wherein the thyristor is able to commutate off after the control circuit renders the gate coupling circuit non-conductive, the control circuit being further configured to maintain the gate coupling circuit non-conductive until at least the beginning of the next half-cycle of the AC power source, thereby assuring that the thyristor remains non-conductive for the remainder of the present half-cycle after the thyristor commutates off.

### Claim 15 (depends on 10)

The load control device of claim 10, wherein the gate coupling circuit comprises at least one MOS-gated transistor electrically coupled between the first main terminal of the thyristor and the gate terminal of thyristor.

### Claim 16 (depends on 15)

The load control device of claim 15, wherein the gate coupling circuit comprises a single MOS-gated transistor in a full-wave rectifier bridge or two MOS-gated transistors electrically coupled in anti-series connection.

### Claim 17 (depends on 1)

The load control device of claim 1, wherein the load control device is arranged such that pulses of current are prevented from being conducted through the gate terminal of the thyristor between the transition time and the end of the present half-cycle.

### Claim 18 (depends on 1)

The load control device of claim 1, wherein the second current path is arranged to conduct current from the AC power source to the electrical load between the transition time and the end of the present half-cycle if the thyristor becomes non-conductive.

### Claim 19

A load control device for controlling power delivered from an AC power source to an electrical load, the load control device comprising:
a thyristor adapted to be electrically coupled between the AC power source and the electrical load, the thyristor having first and second main terminals through which current can be conducted to energize the electrical load and a gate terminal through which current can be conducted to render the thyristor conductive;
a gate coupling circuit electrically coupled between the first main terminal and the gate terminal of the thyristor to conduct current through the gate terminal of the thyristor;
a controllable switching circuit electrically coupled in parallel with the first and second main terminals of the thyristor; and
a control circuit configured to render the gate coupling circuit conductive to conduct a pulse of current through the gate terminal of the thyristor to render the thyristor conductive at a firing time during a present half-cycle of the AC power source, the control circuit configured to control the gate coupling circuit to allow the gate coupling circuit to conduct at least one other pulse of current through the gate terminal of the thyristor again after the firing time until a transition time before the end of the present half-cycle;
wherein the control circuit is configured to render the gate coupling circuit non-conductive between approximately the transition time and the end of the present half-cycle, the control circuit being configured to render the controllable switching circuit conductive to conduct current through the electrical load between approximately the transition time and the end of the present half-cycle.

### Claim 20 (depends on 19)

The load control device of claim 19, wherein the controllable switching circuit comprises at least one MOS-gated transistor.

### Claim 21 (depends on 20)

The load control device of claim 20, wherein the controllable switching circuit comprises a single MOS-gated transistor in a full-wave rectifier bridge.

### Claim 22 (depends on 19)

The load control device of claim 19, wherein the gate coupling circuit comprises at least one MOS-gated transistor electrically coupled between the first main terminal of the thyristor and the gate terminal of thyristor.

### Claim 23 (depends on 22)

The load control device of claim 22, wherein the gate coupling circuit comprises a single MOS-gated transistor in a full-wave rectifier bridge or two MOS-gated transistors electrically coupled in anti-series connection.

### Claim 24 (depends on 19)

The load control device of claim 19, wherein the thyristor is able to commutate off after the transition time during the present half-cycle, the control circuit being further configured to maintain the gate coupling circuit non-conductive until at least the beginning of the next half-cycle of the AC power source, thereby assuring that the thyristor remains non-conductive for the remainder of the present half-cycle after the thyristor commutates off.