# US 9,355,481 B2 · Dynamic visualization for optimization processes

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,355,481 B2
- Document ID: US9355481B2
- Status: Granted
- Kind: B2
- Application number: 14/319,303
- Filed: 2014-06-30
- Published: 2015-05-28
- Granted: 2016-05-31
- Earliest claimed: 2013-11-27
- Assignees: Globalfoundries Inc.
- Applicants: Global Foundries Inc.
- Inventors: Deepak A. Deshpande; Karanbir S. Gujral
- Web page: https://patentgrep.com/patent/US9355481B2

## CPC

- G06T 11/26: Drawing of charts or graphs
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/0637: Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q 10/067: Enterprise or organisation modelling
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Embodiments of the present invention include a method, computer program product, and system for generating a visualization of an optimized project. The computer receives a project and a period of interest associated with the project. The computer determines a constraint status for each constraint associated with the project. The computer generates a graphical element that illustrates the constraint status. The computer generates a visualization of the project during the period of interest, wherein the visualization includes concentric geometric structures and the graphical element.

## Claims

### Claim 1

A method for generating a visualization of an optimized project, the method comprising:
receiving, by a computer system, data associated with a project, and a period of interest associated with the project, the data representing a plurality of project constraints;
determining, by the computer system, a constraint status for each constraint associated with the project, the determining comprising: comparing, at said computer system, a constraint's actual status against a predetermined target status for that constraint and determining based on said comparison an extent to which the constraint is on target compared to the predetermined target status;
generating a graphical element having a display attribute that illustrates the extent to which the constraint's actual status is on target compared to the predetermined target status for that constraint; and
generating a visualization of the project during the period of interest via a graphical user interface in communication with said computer system, wherein the visualization includes concentric graphical structures representing project timeframes and the graphical element displayed at locations within the graphical structures, said graphical element attribute and locations within said structures indicating a dynamic view of a project status in the period of interest.

### Claim 2 (depends on 1)

The method of claim 1, wherein the graphical element attribute reflects the constraint status using one or more of the following: size, coloring, shading, and pattern fill.

### Claim 3 (depends on 1)

The method of claim 1, wherein a project constraint status indicates a progress of a project constraint, said method comprising:
comparing, at said computer system, a constraint's current progress against a planned progress for that constraint in said time period; and
determining based on said comparing, an extent to which the constraint's current progress is on target compared to the planned progress of said time period for the constraint; said generated graphic element displayed with an attribute indicating said extent that the current constraint velocity is on target.

### Claim 4 (depends on 1)

The method of claim 1, wherein a project constraint status indicates a rate of change of a project constraint over the period of time, said method further comprising:
comparing, at said computer system, a constraint's current rate of change in the period of interest against a planned constraint velocity for the period of interest; and
determining based on said comparing, an extent to which the constraint's current rate of change is on target compared to the planned constraint rate of change for the time period; said generated graphic element displayed with an attribute indicating said extent that the current constraint velocity is on target.

### Claim 5 (depends on 4)

The method of claim 4, further comprising:
computing, by said computer system, a constraint's rate of change in said time period of interest as: a subtraction of a current constraint status from a constraint status at a start of said period of interest, and dividing a result of the subtraction by a constraint project target.

### Claim 6 (depends on 4)

The method of claim 4, wherein the rate of change is depicted by a quantity of trailing structures associated with the graphical element, wherein the quantity of trailing structures is proportional to the rate of change.

### Claim 7 (depends on 4)

The method of claim 4, wherein in response to a dynamic view indicating a graphical element having an attribute indicating that the constraint status is on-target for the period of interest but has a shorter actual constraint velocity than a planned constraint velocity for the period of interest, determining a need for additional resources for the constraint to remain on-target.

### Claim 8 (depends on 4)

The method of claim 4, wherein in response to a dynamic view indicating a plurality of graphical elements each graphical element having an attribute indicating that the respective constraint status is off-target, determining one of: allocating additional resources for the project or a re-optimizing of the project to balance existing resources for an optimal project outcome.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
enabling, via said graphical user interface, user selection of a granularity of the comparing.

### Claim 10 (depends on 9)

The method of claim 9, wherein a granularity of comparing represents one of: an on-target range or percentage, an off-target range or percentage, a reference size.

### Claim 11 (depends on 9)

The method of claim 9, further enabling, via said graphical user interface, user selection of a number of graphical element attributes for use in the visualization.

### Claim 12 (depends on 6)

The method of claim 6, further comprising:
enabling, via said graphical user interface, user selection of a velocity value indicating a rate of change of a constraint status for a time period, said velocity value selection used to generated said quantity of trailing structures based on a determined rate of change for the constraint.