# US 9,354,641 B2 · Electric power system control with planning of energy demand and energy efficiency using AMI-based data analysis

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,354,641 B2
- Document ID: US9354641B2
- Status: Granted
- Kind: B2
- Application number: 14/564,791
- Filed: 2014-12-09
- Published: 2015-04-30
- Granted: 2016-05-31
- Earliest claimed: 2013-03-15
- Assignees: Dominion Resources, Inc.
- Applicants: Dominion Resources, Inc.
- Inventors: Melissa A. Peskin; Phillip W. Powell
- Web page: https://patentgrep.com/patent/US9354641B2

## CPC

- G05F 1/10: Regulating voltage or current (G05F1/02 takes precedence)
- G05B 13/04: involving the use of models or simulators
- G05B 15/02: electric
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 50/06: Energy or water supply
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/12: Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J 13/1323: {using optical fibres}
- H02J 13/16: the power network being controlled at grid-level, e.g. using aggregators
- H02J 13/333: the equipment forming part of substations
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 40/124: using wired telecommunication networks or data transmission busses
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method, apparatus, system and computer program is provided for controlling an electric power system, including implementation of an energy planning process (EPP) system which can be used to plan a voltage control and conservation (VCC) system applied to an electrical distribution connection system (EEDCS). The EPP system plans modifications to the EEDCS as a result of operating the VCC system in the “ON” state, in order to maximize the level of energy conservation achieved by the VCC system control of the EEDCS. The EPP system may also identify potential problems in the EEDCS for correction.

## Claims

### Claim 1

A control system for an electric power grid configured to supply electric power from a supply point to a plurality of consumption locations, the system comprising:
a plurality of sensors, wherein each sensor is located at a respective one of a plurality of distribution locations on the distribution grid at or between the supply point and at least one of the plurality of consumption locations, and wherein each sensor is configured to sense a component of the supplied electric power received at the respective distribution location and at least one of the plurality of sensors is configured to generate measurement data based on the sensed component of the power;
a controller configured to receive measurement data from the plurality of sensors, and to identify abnormal operation of voltage using a technique that compares the voltage measurement data against patterns identified in a database relating to system reliability, wherein the patterns comprise deviations from a linear regression, the linear regression being based on a change in voltage from an upstream location to a downstream location for a current at the upstream location.

### Claim 2 (depends on 1)

The system of claim 1, wherein the abnormal operation includes a poor connection between a sensor and a sensor base, an overloaded secondary conductor, an overloaded secondary transformer, an incorrect transformer tap setting, an incompatible type of sensor connected in a sensor base, or a bad neutral connection.

### Claim 3 (depends on 1)

The system of claim 1, wherein the system is a voltage control and energy conservation system using linear regression to select modifications in an EEDS system to optimize voltage conservation and to provide improved voltage reliability, comprising:
an electrical energy delivery system with a substation configured as an electrical supply system supplying power through an electrical distribution system to an electrical usage system for use by electrical usage devices at a plurality of user locations;
the sensors including a plurality of meters, including a meter located at a supply point at the substation, and at least one meter located at a respective at least one of the plurality of consumption locations and at least one of the plurality of meters is configured to generate meter data based on a measured component of electrical power received by the meter;
the controller including a voltage controller configured to operate in a conservation-voltage-reduction-on state or in a conservation-voltage-reduction-off state; wherein the voltage controller applies conservation voltage reduction to generate a conservation voltage reduction energy delivery parameter based on the meter data when the voltage controller is in the conservation-voltage-reduction-on state, but not when the voltage controller is in the conservation-voltage-reduction-off state;
wherein the substation is further configured to adjust a voltage set point value of the electrical power supplied at the supply point to the plurality of consumption locations based on the energy delivery parameter; and
wherein the voltage and energy are measured by the meters on an interval basis using an energy validation process, the change in one or more energy characteristics between the voltage conservation-voltage-reduction-on state and the conservation-voltage-reduction-off state being determined using a paired t measurement.

### Claim 4 (depends on 3)

The system of claim 3, wherein the substation is further configured to adjust a voltage set point value of the electrical power supplied at the supply point to the plurality of consumption locations based on the change in energy characteristics.

### Claim 5 (depends on 3)

The system of claim 3, wherein the controller is further configured to adjust the energy delivery parameter based on the change in the energy characteristic.

### Claim 6 (depends on 3)

The system of claim 3, wherein the energy characteristic is the conservation voltage reduction factor or the energy savings.

### Claim 7 (depends on 3)

The system of claim 3, wherein each sensor's measurement data is averaged over the interval.

### Claim 8 (depends on 3)

The system of claim 3, wherein the wherein the interval is a period of between about one hour and about twenty-four hours.

### Claim 9 (depends on 3)

The system of claim 3, wherein the abnormal operation includes a poor connection between a meter and a meter base, an overloaded secondary conductor, an overloaded secondary transformer, an incorrect transformer tap setting, an incompatible type of meter connected in a meter base, or a bad neutral connection.

### Claim 10 (depends on 1)

The system of claim 1, wherein the controller is further configured to use a pairing process that uses a paired t process including measurements of conservation voltage reduction factor and conservation energy savings by season and further uses linear regression constants to determine the blocks of hours where consistent loads exist and paired t comparisons can be calculated accurately, within predetermined limits.

### Claim 11

A control system for an electric power grid configured to supply electric power from a supply point to a plurality of consumption locations, the system comprising:
a plurality of sensors, wherein each sensor is located at a respective one of a plurality of distribution locations on the distribution grid at or between the supply point and at least one of the plurality of consumption locations, and wherein each sensor is configured to sense a component of the supplied electric power received at the respective distribution location and at least one of the plurality of sensors is configured to generate measurement data based on the sensed component of the power;
a controller configured to generate an energy delivery parameter based on the measurement data received from the plurality of sensors, to operate the electric power grid in a modification-on state or in a modification-off state, and to derive a linear regression, the linear regression being based on a change in voltage from an upstream location to a downstream location for a current at the upstream location;
a component adjusting device configured to adjust a component of the electric power grid in response to the energy delivery parameter;
wherein the component of the supplied electric power is measured by the meters on an interval basis using an energy validation process, the change in energy characteristics between the modification-on state and the modification-off state being determined using the linear regression; and
wherein the controller is further configured to identify modifications to the system using a linearized optimization based on the representation of the energy characteristics.

### Claim 12 (depends on 11)

The system of claim 11, wherein the controller is configured to apply the modification to generate an energy delivery parameter based on the meter data when the controller is in the modification-on state, but not when the controller is in the modification-off state.

### Claim 13 (depends on 11)

The system of claim 11, wherein the controller is configured to determine the change in an energy characteristic between the modification-on state and the modification-off state, and to identify modifications to the system based on the representation of the energy characteristic and the limiting voltage conditions determining the boundaries of optimized voltage operation.

### Claim 14 (depends on 13)

The system of claim 13, wherein the modification is conservation voltage reduction, and the change in an energy characteristic is the conservation voltage reduction factor or the energy savings.

### Claim 15 (depends on 13)

The system of claim 13, wherein the representation of the energy characteristic is the distribution system losses, the conservation voltage reduction losses, or the energy savings.

### Claim 16 (depends on 11)

The system of claim 11, wherein the energy characteristic is distribution system losses and the conservation voltage reduction losses as the performance criterion.

### Claim 17 (depends on 11)

The system of claim 11, wherein the component of the supplied electric power is voltage.

### Claim 18 (depends on 11)

The system of claim 11, wherein the component of the electric power grid adjusting device comprises: a load tap change transformer that adjusts the voltage of the electric power supplied at the supply point based on a load tap change coefficient; or a voltage regulator that adjusts the voltage of the electric power supplied at the supply point or at another point on the distribution grid based on the energy delivery parameter; or a capacitor regulator that adjusts the voltage of the electric power supplied at a point on the distribution grid based on the energy delivery parameter.

### Claim 19 (depends on 11)

The system of claim 11, wherein the controller is configured to use a linear regression technique that compares an operating linear regression pattern against patterns identified in a database relating to normal energy characteristics, normal voltage characteristics, and normal impedance characteristics to forecast and modify energy delivery and system reliability.

### Claim 20 (depends on 11)

The system of claim 11, wherein the controller is configured to use a multisource ESS combined into a linear model.

### Claim 21 (depends on 20)

The system of claim 20, wherein the multisource ESS is plurality of transformers treated as a single transformer for the model.

### Claim 22 (depends on 11)

The system of claim 11 wherein the controller is configured to use linearization, GIS coordinates, and meter voltage correlation to determine the proximity of the meters to the adjusting device.

### Claim 23

A method for controlling electrical power supplied to a plurality of distribution locations located at or between a supply point and at least one consumption location, each of the plurality of distribution locations including at least one sensor configured to sense a voltage of the supplied electric power received at the respective distribution location and at least one of the plurality of distribution locations includes at least one sensor configured to generate measurement data based on the sensed voltage, the method comprising:
controlling the electric power grid in a modification-on state or in a modification-off state; wherein a controller applies the modification to generate an energy delivery parameter based on the meter data when the controller is in the modification-on state, but not when the controller is in the modification-off state;
operating a component adjusting device configured to adjust a component of the electric power grid in response to the energy delivery parameter;
measuring the component of the supplied electric power with the sensors on an interval basis using an energy validation process, and determining the change in one or more energy characteristics between the voltage conservation-voltage-reduction-on state and the conservation-voltage-reduction-off using a linear regression; and
operating the controller to: identify abnormal operation of voltage using a linear regression technique that compares the operating linear regression pattern against patterns identified in a database relating to system reliability, wherein the patterns comprise deviations from a linear regression, the linear regression being based on a change in voltage from an upstream location to a downstream location for a current at the upstream location.

### Claim 24 (depends on 23)

The method of claim 23, wherein the component of the supplied electric power is voltage.

### Claim 25 (depends on 23)

The method of claim 23, wherein the modification is conservation voltage reduction.

### Claim 26 (depends on 23)

The method of claim 23, wherein the component of the electric power grid adjusting device comprises: a load tap change transformer that adjusts the voltage of the electric power supplied at the supply point based on a load tap change coefficient; or a voltage regulator that adjusts the voltage of the electric power supplied at the supply point or at another point on the distribution grid based on the energy delivery parameter; or a capacitor that adjusts the voltage of the electric power supplied at a point on the distribution grid based on the energy delivery parameter.

### Claim 27 (depends on 23)

The method of claim 23 wherein the energy characteristic is the conservation voltage reduction factor or the energy savings.

### Claim 28 (depends on 23)

The method of claim 23, wherein each sensor's data is averaged over the interval.

### Claim 29 (depends on 23)

The method of claim 23, wherein the wherein the interval is a period of between about 1 hour and about twenty-four hours.

### Claim 30 (depends on 23)

The method of claim 23, wherein the abnormal operation includes a poor connection between a meter and a meter base, an overloaded secondary conductor, an overloaded secondary transformer, an incorrect transformer tap setting, an incompatible type of meter connected in a meter base, or a bad neutral connection.