# US 9,353,683 B2 · Method for storing compressed air in porous subsurface locations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,353,683 B2
- Document ID: US9353683B2
- Status: Granted
- Kind: B2
- Application number: 13/654,775
- Filed: 2012-10-18
- Published: 2013-05-16
- Granted: 2016-05-31
- Earliest claimed: 2011-11-15
- Assignees: ConocoPhillips Company
- Applicants: Conocophillips Company
- Inventors: Joseph G. Bernica; James E. Sylte
- Web page: https://patentgrep.com/patent/US9353683B2

## CPC

- F02C 6/16: for storing compressed air
- B65G 5/00: Storing fluids in natural or artificial cavities or chambers in the earth
- B65G 5/005: {in porous layers}
- Y02E 60/16: Mechanical energy storage, e.g. flywheels or pressurised fluids
- F02C: GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS (construction of turbines F01D; jet-propulsion plants F02K; construction of compressors or fans F04; generating combustion products of high pressure or high velocity F23R; using gas turbines in compression refrigeration plants F25B11/00)
- B65G: TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS (packaging B65B; handling thin or filamentary materials, e.g. paper sheets or thread, B65H; cranes B66C; portable mobile or lifting or hauling appliances, e.g. hoists, B66D; devices for lifting or lowering goods for loading or unloading purposes, e.g. fork-lift trucks, B66F9/00; emptying bottles, jars, casks, barrels or similar containers, not otherwise provided for, B67C9/00; delivering or transferring liquids B67D; filling or discharging vessels for liquefied, solidified or compressed gases F17C; pipe-line systems for fluids F17D)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A methodology for storing compressed air in porous subterranean formations for subsequent production and use in generating electricity.

## Claims

### Claim 1

A process for storing compressed air in a porous subterranean formation, the process comprising:
without injecting air into the porous subterranean formation, pumping water from the porous subterranean formation having a single porosity or a variety of porosities to an earthen surface and simultaneously lowering an internal pressure of the porous subterranean formation to a first predetermined pressure;
simultaneously injecting air into and pumping water from the porous subterranean. formation;
ramping-up air injection into the porous subterranean formation; and
creating a volume of compressed air at the peak of the porous subterranean formation.

### Claim 2 (depends on 1)

The process according to claim 1, the process further comprising:
cycling between injecting air into the porous subterranean formation and producing air from the porous subterranean formation.

### Claim 3 (depends on 1)

The process according to claim 1, wherein ramping-up air injection further comprises, in the following order: (a) injecting air for 20 days at 2 MMscf/d, (b) injecting air for 20 days at 4 MMscf/d, (c) injecting air for 20 days at 6 MMscf/d, (d) injecting air for 20 days at 8 MMscf/d, (e) injecting air for 30 days at 10 MMscf/d, (f) injecting air for 30 days injecting air at 20 MMscf/d, (g) injecting air for 30 days at 30 MMscf/d, and (h) injecting air for 30 days at 50 MMscf/d.

### Claim 4 (depends on 1)

The process according to claim 1, wherein ramping-up air injection further comprises successively increasing air injection rates without intervening periods of non-air injection.

### Claim 5 (depends on 1)

The process according to claim 1, wherein ramping-up air injection further comprises successively increasing air injection rates without intervening periods of decreasing air injection.

### Claim 6 (depends on 1)

The process according to claim 1, wherein injecting air from the porous subterranean formation further comprises injecting air only the peak of the porous subterranean formation.

### Claim 7 (depends on 1)

The process according to claim 1, wherein pumping water from the porous subterranean formation further comprises pumping water from a location of the porous subterranean formation that is farthest from the earthen surface.

### Claim 8 (depends on 1)

The process according to claim 1, wherein pumping water from the porous subterranean formation to the earthen surface further comprises pumping water from porous rock of the porous subterranean formation.

### Claim 9

A process for storing compressed air in a porous subterranean formation, in the following order, comprising:
pumping water from the porous subterranean formation having a single porosity or a variety of porosities to an earthen surface;
lowering an internal pressure of the porous subterranean formation to a first predetermined pressure without injecting air into the porous subterranean formation;
simultaneously injecting air into and pumping water from the porous subterranean formation;
measuring the subterranean pressure of the porous subterranean formation;
upon the subterranean pressure reaching the first predetermined pressure, ramping-up a rate of air injection into the porous subterranean formation; and
creating a volume of compressed air at the peak of the porous subterranean formation.

### Claim 10 (depends on 9)

The process according to claim 9, the process further comprising:
cycling between injecting air into the porous subterranean formation and producing air from the porous subterranean formation.

### Claim 11 (depends on 10)

The process according to claim 10, wherein cyclically injecting air into the porous subterranean formation and producing air from the porous subterranean formation are performed serially without an intervening step.

### Claim 12 (depends on 9)

The process according to claim 9, wherein ramping-up a rate of air injection further comprises, in the following order: (a) injecting air for 20 days at 2 MMscf/d, .(b) injecting air for 20 days at 4 MMscf/d, (c) injecting air for 20 days at 6 MMscf/d, (d) injecting air for 20 days at 8 MMscf/d, (e) injecting air for 30 days at 10 MMscf/d; (f) injecting air for 30 days injecting air at 20 MMscf/d, (g) injecting air for 30 days at 30 MMscf/d, and (h) injecting air for 30 days at 50 MMscf/d.

### Claim 13 (depends on 9)

The process according to claim 9, wherein ramping-up a rate of air injection further comprises successively increasing a rate of air injection without any intervening period of decreasing a rate of air injection.

### Claim 14 (depends on 10)

The process according to claim 10, wherein injecting air into the porous subterranean formation further comprises injecting air at the peak of the porous subterranean formation.

### Claim 15 (depends on 9)

The process according to claim 9, wherein pumping water from the porous subterranean formation further comprises pumping water from an area of the porous subterranean formation that is farthest from the earthen surface.

### Claim 16 (depends on 9)

The process according to claim 9, wherein ramping-up a rate of air injection further comprises successively increasing a rate of air injection into porous rock.

### Claim 17

A process for storing compressed air in a porous subterranean formation, having steps in the following order, comprising:
placing an air injection tube at a peak of the porous subterranean formation having a single porosity or a variety of porosities;
without injecting air into the porous subterranean formation, lowering an internal pressure of the porous subterranean formation to a first predetermined pressure by pumping water from the porous subterranean formation to an earthen surface;
simultaneously injecting air into the porous subterranean formation via the air injection tube and pumping water from the porous subterranean formation;
measuring the internal pressure of the porous subterranean formation;
increasing an air injection rate into the porous subterranean formation upon the internal pressure reaching the first predetermined pressure; and
creating and maintaining a volume of compressed air at the peak of the porous subterranean formation by cycling between injecting air into the porous subterranean formation producing air from the porous subterranean formation.

### Claim 18 (depends on 17)

The process according to claim 17, wherein increasing an air injection rate into the porous subterranean formation upon the internal pressure reaching the first predetermined pressure further comprises increasing an air injection rate into porous rock.

### Claim 19 (depends on 18)

The process according to claim 18, wherein increasing an air injection rate further comprises multiple increases in the rate of air injection without any intervening period of non-air injection.