# US 9,353,601 B2 · Articulation festoon cabling beams

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 9,353,601 B2
- Document ID: US9353601B2
- Status: Granted
- Kind: B2
- Application number: 14/174,656
- Filed: 2014-02-06
- Published: 2014-08-14
- Granted: 2016-05-31
- Earliest claimed: 2013-02-12
- Assignees: Nabors Drilling USA
- Applicants: Nabors Drilling USA
- Inventors: Ryan Hause
- Web page: https://patentgrep.com/patent/US9353601B2

## CPC

- E21B 41/00: Equipment or details not covered by groups E21B15/00 - E21B40/00
- H02G 11/00: Arrangements of electric cables or lines between relatively-movable parts
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- H02G: INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES

## Abstract

The cable handling apparatus includes a trolley beam, where the trolley beam is adapted to allow a cable trolley to slide thereon and an articulating arm. The articulating arm is hingedly coupled to the trolley beam, and the articulating arm is hingedly coupled to a piece of wellsite equipment. The articulating arm is repositionable between a retracted position and an extended position.

## Claims

### Claim 1

A beam trolley festoon system comprising:
a first trolley beam, the first trolley beam adapted to allow a cable trolley to slide thereon;
a first articulating arm, the first articulating arm hingedly coupled to the first trolley beam, the first articulating arm hingedly coupled to a first piece of wellsite equipment, the first articulating arm repositionable between a retracted position and an extended position;
a second trolley beam, the second trolley beam adapted to allow the cable trolley to slide thereon;
a second articulating arm, the second articulating arm hingedly coupled to the second trolley beam, the second articulating arm hingedly coupled to a second piece of wellsite equipment, the second articulating arm repositionable between a retracted position and an extended position;
the first trolley beam and second trolley beam selectively coupleable when in the extended position.

### Claim 2 (depends on 1)

The beam trolley festoon system of claim 1, wherein the first and second pieces of wellsite equipment are positioned in a wellsite substantially aligned such that, when the first and second articulating arms are positioned in the extended position, the first and second trolley beams are substantially aligned and are coupleable to form a continuous trolley beam assembly such that the cable trolley may slide freely from the first trolley beam to the second trolley beam.

### Claim 3 (depends on 2)

The beam trolley festoon system of claim 2, wherein two or more cable trolleys are positioned on the continuous trolley beam.

### Claim 4 (depends on 3)

The beam trolley festoon system of claim 3, wherein a cable is coupled to each of the cable trolleys such that the cable festoons below each of the cable trolleys as each of the cable trolleys move closer together.

### Claim 5 (depends on 3)

The beam trolley festoon system of claim 3, wherein each cable trolley of the two or more cable trolleys is coupled to at least one adjacent cable trolley by a spacing cable, the spacing cable having a length shorter than a length of the cable between the adjacent cable trolleys.

### Claim 6 (depends on 1)

The beam trolley festoon system of claim 1, wherein the first and second articulating arms are hingedly coupled to the first and second pieces of wellsite equipment by a first and second hinge assemblies respectively, the first and second hinge assemblies each comprising a hinge and a pinning assembly, the pinning assembly positioned to retain the first and second articulating arms in at least one of the retracted position and the extended position.

### Claim 7 (depends on 1)

The beam trolley festoon system of claim 1, wherein the first and second trolley beams comprise an I-beam.

### Claim 8 (depends on 1)

The beam trolley festoon system of claim 1, wherein the first piece of wellsite equipment comprises a frame and the first articulating arm is hingedly coupled to the frame of the first piece of wellsite equipment.

### Claim 9 (depends on 1)

The beam trolley festoon system of claim 1, wherein the first piece of wellsite equipment comprises one of an equipment house, tank, mud pump skid, or substructure box framing.

### Claim 10

A method for rigging up a beam trolley festoon system, the method comprising:
positioning a first piece of wellsite equipment at a wellsite, the first piece of wellsite equipment including:
a first trolley beam, the first trolley beam adapted to allow a cable trolley to slide thereon;
a first articulating arm, the first articulating arm hingedly coupled to the first trolley beam, the first articulating arm hingedly coupled to the first piece of wellsite equipment, the first articulating arm repositionable between a retracted position and an extended position;
positioning a second piece of wellsite equipment at the wellsite generally aligned with and near the first piece of wellsite equipment, the second piece of wellsite equipment including:
a second trolley beam, the second trolley beam adapted to allow the cable trolley to slide thereon;
a second articulating arm, the second articulating arm hingedly coupled to the second trolley beam, the second articulating arm hingedly coupled to the second piece of wellsite equipment, the second articulating arm repositionable between a retracted position and an extended position;
positioning the first and second trolley beams into the extended position;
coupling the first and second trolley beams.

### Claim 11 (depends on 10)

The method of claim 10, further comprising:
pinning with a pinning assembly at least one of the first or second articulating arms in the extended position.

### Claim 12 (depends on 10)

The method of claim 10, further comprising:
decoupling the first and second trolley beams;
positioning the first trolley beam into the retracted position;