Metering controller for injection molding machine
AssigneeFanuc Corporation
InventorsJunpei Maruyama, Tatsuhiro Uchiyama
Life of this patent
Estimating the term…
Abstract
During metering, a screw is retreated to a preset metering completion position while it is being forwardly rotated. Pilot injection is performed such that the screw is reversely rotated and advanced so that a resin pressure reaches a predetermined compression pressure, during a time period between the end of the metering and the start of injection. The screw reverse rotation is continued before the screw advance is started for the pilot injection. In this way, a check valve can be closed at a relatively low pressure such that precision metering can be achieved.
Claims7
A metering controller for an injection molding machine, comprising:
- a screw advancing/retreating unit for advancing and retreating a screw;
- a screw rotating unit for rotating the screw;
- a resin pressure detection unit configured to detect a resin pressure;
- a metering unit configured to retreat the screw to a preset metering completion position while forwardly rotating the screw during metering;
- a screw reverse rotation unit configured to reversely rotate the screw during a time period between the end of the metering and the start of injection;
- and
- a pilot injection unit configured to advance the screw so that the resin pressure reaches a predetermined compression pressure during the time period between the end of the metering and the start of the injection,
- wherein the pilot injection unit is configured to start screw advance, while reverse rotation of the screw is continued, after the start of the screw reverse rotation by the screw reverse rotation unit, and
- the screw reverse rotation unit is configured to finish the screw reverse rotation after the start of the screw advance by the pilot injection unit.
Dependencies are inferred from the claim text.