Back to results
US 9,311,810 B2Granted
Implementing standardized behaviors in a hosting device
AssigneeGeneral Electric Company
InventorJohnny Downor
Life of this patent
Estimating the term…
Abstract
A system includes a standard functionality hosting device. The hosting device includes standard functionality hosting logic that includes machine-readable instructions stored on a tangible, non-transitory machine-readable medium configured to implement, control, or implement and control management functionalities defined by a standard, for one or more devices that are not independently enabled to implement, control, or implement and control the management functionalities. Further, the hosting device includes a processor configured to implement the alarm standard hosting logic.
Claims1
A system, comprising:
- a standard functionality hosting device, comprising:
- standard functionality hosting logic comprising machine-readable instructions stored on a tangible, non-transitory machine-readable medium configured to implement, control, or implement and control management functionalities comprising alarm prioritization, alarm shelving, alarm out of service functionality, or any combination thereof defined by a standard, for one or more devices that are not independently enabled to implement, control, or implement and control the management functionalities;
- a processor configured to implement the alarm standard hosting logic;
- wherein the standard functionality hosting logic is configured to:
- monitor the one or more devices for alarms;
- receive an alarm from the one or more devices;
- determine whether the alarm has been set as out of service or shelved by the standard functionality hosting logic;
- disable or otherwise differentiate presentation of the alarm if the alarm is set as out of service;
- disable or otherwise differentiate presentation of the alarm if the alarm is set as shelved and a shelving time period has not elapsed;
- and
- present the alarm normally if the alarm is not set as out of service, shelved, or if the shelving time period has elapsed.
8 more elements
Dependencies are inferred from the claim text.