Fluid communication with an earth formation through cement
AssigneeThru Tubing Solutions, Inc.
InventorsBrock W. Watson, Roger L. Schultz, Andrew M. Ferguson
Life of this patent
Estimating the term…
Loading patent…
AssigneeThru Tubing Solutions, Inc.
InventorsBrock W. Watson, Roger L. Schultz, Andrew M. Ferguson
Estimating the term…
A well system can include a well tool with a retarder chemical. The retarder chemical is released from the well tool into an annulus and retards setting of cement therein. A method of retarding setting of cement at a location in an annulus can include releasing a retarder chemical from a well tool connected in a casing string, after the cement is placed in the annulus. A well tool can include a valve that controls fluid communication via a port between an exterior of the tool and a flow passage extending through the tool, an annular recess, and a dispersible annular exterior component received in the recess. Another well tool can include a valve that controls fluid communication between an exterior of the tool and a flow passage extending through the well tool, an internal chamber, and a retarder chemical in the chamber.
A well system, comprising:
A method of retarding setting of a cement at one or more discrete locations in a well annulus, the method comprising:
A well tool, comprising:
Dependencies are inferred from the claim text.