Change convergence risk planning and avoidance
AssigneeBank of America Corporation
InventorsJames W. Faile, Jr., James J. Micek, Roxanna L. Cummings, Jodi L. Petersen
Life of this patent
Estimating the term…
Loading patent…
AssigneeBank of America Corporation
InventorsJames W. Faile, Jr., James J. Micek, Roxanna L. Cummings, Jodi L. Petersen
Estimating the term…
Disclosed is a change convergence risk mitigation system. The change convergence risk mitigation system typically includes a processor, a memory, and a risk mitigation module stored in the memory. The change convergence risk mitigation system is typically configured for: receiving information associated with a plurality of events; determining an event risk score for each of the plurality of events; aggregating the event risk scores of the plurality of events and, based on the event risk scores, determining a risk level for each of the plurality of time periods; identifying a risk mitigation event; determining a risk mitigation time period from the plurality of time periods such that the risk mitigation time period would not have a predefined level if the risk mitigation event occurred during the risk mitigation time period; and providing a recommendation that the risk mitigation event occur during the risk mitigation time period.
A change convergence risk mitigation system, comprising:
A computer program product for change convergence risk mitigation comprising a non-transitory computer-readable storage medium having computer-executable instructions for:
A method for change convergence risk mitigation, comprising:
Dependencies are inferred from the claim text.