Vacuum pumping system having an ejector and check valve
AssigneeAdixen Vacuum Products
InventorThierry Neel
Life of this patent
Estimating the term…
Abstract
A pumping device and method are described. The pumping device comprises a dry rough vacuum pump equipped with a gas inlet connected to a vacuum chamber, a gas outlet leading to a conduit and an ejector. The pumping method comprises pumping gases contained in the vacuum chamber using the dry rough vacuum pump through the gas inlet, measuring electric power consumed by the dry rough vacuum pump and the pressure of the gases in the conduit, starting the ejector, when the pressure of the gases at the outlet and the electrical power consumed cross respective set point values as they rise and stopping the ejector when the electric power consumed and the pressure of the gases in the conduit at the outlet cross respective set point values as they fall.
Claims16
In a system comprising a load lock vacuum chamber and a pumping device, said pumping device comprising:
- a conduit having first and second opposing ends;
- a dry rough vacuum pump including a gas inlet orifice coupled to the load lock vacuum chamber, and a gas outlet orifice adapted to couple to a first end of the conduit;
- a discharge check valve placed within the conduit;
- and
- an ejector placed parallel in relation to the discharge check valve, said ejector comprising:
- an ejector Intake orifice adapted to couple to an opening on the first end of the conduit by a first pipe;
- and
- an ejector discharge orifice adapted to couple to an opening on the second end of the conduit by a second pipe;
- and
- an ejector-controlling apparatus having at least one input and an output with a first one of the ejector-controlling apparatus inputs adapted to couple to the gas outlet orifice, said ejector-controlling apparatus configured to measure pressure of gas in the first end of the conduit and electric power consumed by the dry rough vacuum pump and, in response to the measured gas pressure and the measured electric power,
- start the ejector after a time delay selected to allow for start of the ejector at a predetermined portion of a first phase of the pumping cycle and not throughout each of a plurality of pumping phases in the pumping cycle once a predetermined pressure has been reached in the load lock vacuum chamber and based upon the measured gas pressure crossing a gas pressure set point value and the measured electrical power crossing a power set point value in the first phase of the plurality of pumping phases in a pumping cycle, or
- stop the ejector based upon the measured gas pressure crossing the gas pressure set value and the measured electrical power crossing the power set point value.
A method for pumping with a pumping device in a system including a load lock vacuum chamber and the pumping device, the pumping device including a dry rough vacuum pump fitted with a gas inlet orifice coupled to the load lock vacuum chamber, and a gas outlet orifice opening to a conduit and coupled to an ejector, the pumping device further including a discharge check valve placed within the conduit, wherein the ejector is placed parallel in relation to the discharge check valve, the method comprising:
- pumping, via the dry rough vacuum pump, gases contained in the load lock vacuum chamber through the gas inlet orifice;
- measuring electric power consumed by the dry rough vacuum pump and pressure of the gases in the conduit at the gas outlet orifice of the dry rough vacuum pump;
- once a predetermined pressure has been reached in the load lock vacuum chamber, and in response to rising pressure of gases at the gas outlet orifice of the dry rough vacuum pump crossing a gas pressure set point value and rising electrical power consumed by the dry rough vacuum pump crossing a power set point value in a first phase of a plurality of pumping phases in a pumping cycle, starting the ejector after a time delay selected to allow for starting of the ejector at a predetermined portion of the first phase of the pumping cycle and not throughout each of the plurality of pumping phases in the pumping cycle;
- and
- in response to the electric power consumed by the dry rough vacuum pump crossing the power set point value as it falls and the pressure of the gases in the conduit at the gas outlet orifice of the dry rough vacuum pump crossing the gas pressure set point value as it falls, stopping the ejector.
Dependencies are inferred from the claim text.