Lifecycle obsolescence forecasting tool
AssigneeThe Boeing Company
InventorsWilliam E. Helms, Bobby Gene Bradley, Jr., Courtney LeeAnne Matzkind, David Michael Matlock, Kerry Hale Burden, Charles V. Bauerle
Life of this patent
Estimating the term…
Loading patent…
AssigneeThe Boeing Company
InventorsWilliam E. Helms, Bobby Gene Bradley, Jr., Courtney LeeAnne Matzkind, David Michael Matlock, Kerry Hale Burden, Charles V. Bauerle
Estimating the term…
A lifecycle obsolescence forecasting system. The system may include a data integrator configured to receive part information for a plurality of parts. The system may include a sustainability optimizer configured to receive one or more sustainability requirements for a part in the plurality of parts. The system may include a forecaster coupled to the data integrator and the sustainability optimizer, wherein the forecaster may be configured to analyze the part information and the one or more sustainability requirements to establish a component stock-out date for the part, wherein the component stock-out date may comprise a date when a last spare of the part is forecast to be removed from stock, and wherein the component stock-out date may be established as a function of at least the part usage rate and a corresponding failure rate of the part.
A lifecycle obsolescence forecasting system for maintaining an aircraft comprising:
A lifecycle obsolescence forecasting method for maintaining an aircraft, the method comprising:
A lifecycle obsolescence forecasting system for maintaining an aircraft comprising:
Dependencies are inferred from the claim text.