Method and system for remediating and covering wood floors
AssigneeUniversal Floor & Wall Systems, Inc.
InventorRobert Walter Smith
Life of this patent
Estimating the term…
Abstract
A method and system for covering industrial wood plank or wood block floors that can be installed quickly without creating a hazardous environment or hazardous wastes and without the necessity of removing installed equipment. Sand is swept over the wood to fill voids and cracks. Next metal lath is stapled to the wood. A first layer of epoxy is poured onto the metal lath. After this is cured, a second coat of finish epoxy can be installed on the first epoxy layer. When this dries, the job is done and operations can be restarted, or an optional topcoat can be applied. The epoxy material used can be self-leveling for ease of application and the final floor is approximately level. The finished floor is flexible to not crack under heavy loads and to absorb shock.
Claims22
A method for remediating a wood floor comprising:
- In a first 24 hour period:
- sweeping a material consisting essentially of sand into voids in said wood floor;
- fastening ridge-lath to said floor;
- applying a first layer of self-leveling epoxy over said ridge-lath;
- allowing said first layer to cure;
- in a second 24 hour period subsequent said first 24 hour period:
- applying a second layer of self-leveling epoxy over said first layer;
- allowing said second layer to cure;
- in a third 24 hour period subsequent said second 24 hour period:
- painting walkways and/or stop signs on said floor;
- applying a topcoat layer of epoxy over said second layer after said stop signs and/or walkways are in place painted;
- wherein said first, second and topcoat layers of epoxy have 15-16% elongation.
A method for remediating a wood floor comprising:
- first in a first 24 hour period:
- sweeping a material consisting essentially of sand into voids in said wood floor;
- also in said first 24 hour period, fastening metal lath to said floor;
- in a second 24 hour period subsequent said first 24 hour period:
- applying a first layer of epoxy over said metal lath, and allowing said first layer to cure;
- also in said second 24 hour period, applying a second layer of epoxy over said first layer, and allowing said second layer to cure;
- in a third 24 hour period subsequent said second 24 hour period:
- painting walkways and/or stop signs on said floor;
- also in said third 24 hour period, applying a topcoat of epoxy after said stop signs and/or walkways are painted.
A method for remediating a wood floor comprising:
- in a first 24 hour period, sweeping a material consisting essentially of sand into voids in said wood floor;
- also in said first 24 hour period, fastening metal lath to said floor;
- in a second 24 hour period subsequent said first 24 hour period:
- applying a first layer of epoxy over said metal lath, and allowing said first layer to cure;
- also in said second 24 hour period, applying a second layer of epoxy over said first layer, and allowing said second layer to cure;
- wherein said epoxy is self-leveling of at least 15-16% elongation;
- and wherein said sand has a mesh size between approximately 20 and 80 sieve.
Dependencies are inferred from the claim text.