Scheduling workloads based on detected hardware errors
AssigneeInternational Business Machines Corporation
InventorVenkatesh Sainath
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorVenkatesh Sainath
Estimating the term…
Scheduling workloads based on detected hardware errors is provided. In response to determining that a hardware error is detected, it is determined whether the hardware error is a cache error. In response to determining that the hardware error is a cache error, it is determined whether execution of a workload on a processor is changing contents of a cache associated with the cache error more than a threshold value. In response to determining that the execution of the workload on the processor is changing the contents of the cache associated with the cache error more than the threshold value, it is determined whether the cache associated with the cache error is private to a core in the processor. In response to determining that the cache associated with the cache error is private to a core, the execution of the workload is scheduled on a different core of the processor.
A computer implemented method for scheduling workloads based on detected hardware errors, the computer implemented method comprising:
A data processing system for scheduling workloads based on detected hardware errors, the data processing system comprising:
A computer program product stored on a computer readable storage device having computer usable program code embodied thereon that is executable by a data processing system for scheduling workloads based on detected hardware errors, the computer program product comprising:
Dependencies are inferred from the claim text.