Software factory readiness review
AssigneeInternational Business Machines Corporation
InventorsJarir K. Chaar, Ronald D. Finlayson, Thomas A. Jobson, Jr., Naomi M. Mitsumori, Francis X. Reddington
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsJarir K. Chaar, Ronald D. Finlayson, Thomas A. Jobson, Jr., Naomi M. Mitsumori, Francis X. Reddington
Estimating the term…
A computer-implemented method, system, and computer-readable medium for determining if a software factory is ready to take on a software project is presented. In a preferred embodiment, the computer-implemented method includes the steps of: determining if an infrastructure for a software factory has been procured; determining if operational software needed to assemble work packets in an assembly line in the software factory has been installed; determining if a workflow event model for an assembly line in the software factory has been configured; determining if workload in the assembly line has been balanced; determining if communication channels between the software factory and a customer's computer system have been defined and cleared for data transmission; and in response to determining that any element described above has been determined not to have occurred, prohibiting an induction of a software project into the software factory.
A computer-implemented method for delivering custom software, comprising:
A system, comprising:
An article of manufacture, comprising:
Dependencies are inferred from the claim text.