Tracking area reconfiguration based on sector load
AssigneeSprint Spectrum L.P.
InventorsJasinder P. Singh, Sachin R. Vargantwar, Maulik K. Shah, Deveshkumar Rai
Life of this patent
Estimating the term…
Loading patent…
AssigneeSprint Spectrum L.P.
InventorsJasinder P. Singh, Sachin R. Vargantwar, Maulik K. Shah, Deveshkumar Rai
Estimating the term…
A method and corresponding system is provided to help mitigate sector congestion. In one embodiment of the method, a RAN entity evaluates load among sectors of a tracking area and determines that the load is at least a threshold level of load. In response, the RAN entity enlarges the tracking area. In another embodiment of the method, when the RAN entity makes a decision to reconfigure a tracking area, it may consider one or more factors when determining how to reconfigure. In one example, the RAN entity may identify a particular border sector that has at least a threshold level of load or is a border sector in another network. Responsively, the RAN may reconfigure the tracking area such that the identified border sector is no longer a border sector. Other examples are possible.
In a wireless communication system in which a plurality of sectors of a radio access network (RAN) are organized into a plurality of tracking areas with each tracking area of the plurality of tracking areas having a respective size and at least one user equipment (UE) operating therein, a method comprising:
In a wireless communication system in which a plurality of sectors of a radio access network (RAN) are organized into a plurality of tracking areas, wherein each given tracking area of the plurality of tracking areas includes (i) one or more border sectors that border at least one other tracking area, and (ii) at least one user equipment (UE) operating therein, a method comprising:
In a wireless communication system in which a plurality of sectors are shared by a first radio access network (RAN) and a second RAN, wherein each sector of the plurality of sectors is included in a respective tracking area of the first RAN and a respective tracking area of the second RAN, and wherein each tracking area of the first RAN and each tracking area of the second RAN includes (i) one or more border sectors that border at least one other tracking area, and (ii) at least one user equipment (UE) operating therein, a method comprising:
Dependencies are inferred from the claim text.