# US 8,771,567 B2 · Process for producing fibre preforms

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 8,771,567 B2
- Document ID: US8771567B2
- Status: Granted
- Kind: B2
- Application number: 12/903,867
- Filed: 2010-10-13
- Published: 2011-06-23
- Granted: 2014-07-08
- Earliest claimed: 2008-04-16
- Assignees: Airbus Operations GmbH; Toho Tenax Europe GmbH
- Applicants: Joachim Piepenbrock; Carsten Barlag; Pierre Zahlen; Bernd Wohlmann; Markus Schneider
- Inventors: Joachim Piepenbrock; Carsten Barlag; Pierre Zahlen; Bernd Wohlmann; Markus Schneider
- Web page: https://patentgrep.com/patent/US8771567B2

## CPC

- B29B 11/16: comprising fillers or reinforcement {(non-woven fabrics per se D04H1/00, D04H3/00)}
- Y10T 156/1089: of discrete laminae to single face of additional lamina
- B29B: PREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A process for producing fiber preforms for composite material components makes it possible to directly produce complex geometries in a flexible and low-cost manner by applying a plurality of dry fiber rovings independently of one another even in spatially uneven contours. It is no longer necessary to use cut fabric strips since fiber preforms are produced straight from the dry fiber rovings. This obviates the need to carry out production, transport and order picking processes. It is not necessary to cut fiber strips to size, and therefore a saving may be made on material. In addition, it is possible to increase the mechanical characteristic values in the composite material because it is not necessary to sew fiber webs. The described process can also readily be scaled since the number of dry fiber rovings arranged next to one another make it possible to vary the area which can be covered.

## Claims

### Claim 1

A process for the production of a fibre preform comprising:
feeding of a plurality of dry fibre rovings provided with a binder to a contoured mould independently of one another, at least some dry fibre rovings being fed at a different speed;
simultaneous laying and fixing by activation of the binder of the plurality of dry fibre rovings next to one another directly on the mould or on dry fibre rovings positioned on the contoured mould to form the fibre preform, and
severing of the dry fibre rovings; and
impregnating or infiltrating the laid dry fibre rovings of the fibre preform on the mould with a curable plastics material.

### Claim 2 (depends on 1)

The process according to claim 1, wherein in the procedural step of feeding the dry fibre rovings, dry fibre rovings based on carbon, aramid, polyester or glass fibres are fed.

### Claim 3 (depends on 1)

The process according to claim 1, wherein dry fibre rovings which flow one on top of another are substantially laid at an angle of at least 25° to one another.

### Claim 4 (depends on 1)

The process according to claim 1, wherein the dry fibre rovings are laid one on top of another at two or more different angles to one another in the form of a multiaxial fabric.

### Claim 5 (depends on 1)

The process according to claim 1, wherein in a procedural step before being laid, the dry fibre rovings are provided with a thermoplastic binder.

### Claim 6 (depends on 1)

The process according to claim 1, wherein in the procedural step of severing the dry fibre rovings, at least some dry fibre rovings are severed independently of one another by at least one severing unit.

### Claim 7 (depends on 1)

The process according to claim 1, wherein the binder is activated by contact pressure and/or thermal radiation and/or microwave radiation and/or infrared radiation and/or UV radiation and/or laser radiation and/or the introduction of inductive energy and/or contact heating.

### Claim 8

A process for the production of a fibre composite, comprising:
feeding of a plurality of dry fibre rovings provided with a binder to a three-dimensionally contoured mould independently of one another, at least some dry fibre rovings being fed at a different speed;
simultaneously laying the plurality of dry fibre rovings next to one another directly on the mould or on dry fibre rovings positioned on the mould and fixing the plurality of dry fibre rovings by activation of the binder;
severing of the dry fibre rovings; and
impregnating or infiltrating the laid dry fibre rovings on the mould with a curable plastics material.

### Claim 9 (depends on 8)

The process according to claim 8, wherein the dry fibre rovings are selected from the group consisting of carbon, aramid, polyester, or glass fibres.

### Claim 10 (depends on 8)

The process according to claim 8, wherein dry fibre rovings which are laid on dry fibre rovings positioned on the mould are laid at an angle of at least 25° to one another.

### Claim 11 (depends on 8)

The process according to claim 8, wherein the dry fibre rovings are laid one on top of another at two or more different angles to one another.

### Claim 12 (depends on 8)

The process according to claim 8, wherein the dry fibre rovings are provided with the binder before being laid.

### Claim 13 (depends on 8)

The process according to claim 8, wherein, in the step of severing the dry fibre rovings, at least some dry fibre rovings are severed independently of one another by at least one severing unit.

### Claim 14 (depends on 8)

The process according to claim 8, wherein the binder is activated by contact pressure and/or thermal radiation and/or microwave radiation and/or infrared radiation and/or UV radiation and/or laser radiation and/or the introduction of inductive energy and/or contact heating.

### Claim 15

A process for the production of a fibre preform comprising:
feeding of a plurality of dry fibre rovings provided with a binder to a three-dimensionally contoured mould independently of one another, wherein at least some of the dry fibre rovings are fed at different speeds;
simultaneously laying the plurality of dry fibre rovings next to one another directly over a three-dimensional contour of the mould and fixing the dry fibre rovings by activation of the binder, and
severing of the fed dry fibre rovings;
wherein the laid and fixed dry fibre rovings form the said fibre preform to be impregnated or infiltrated with a curable plastics material on the mould.

### Claim 16 (depends on 15)

The process according to claim 15, wherein the dry fibre rovings are based on carbon, aramid, polyester or glass fibres.

### Claim 17 (depends on 15)

The process according to claim 15, wherein dry fibre rovings which flow one on top of another are substantially laid at an angle of at least 25° to one another.

### Claim 18 (depends on 15)

The process according to claim 15, wherein the dry fibre rovings are laid one on top of another at two or more different angles to one another in the form of a multiaxial fabric.

### Claim 19 (depends on 15)

The process according to claim 15, wherein, before being laid, the dry fibre rovings are provided with a thermoplastic binder.

### Claim 20 (depends on 15)

The process according to claim 15, wherein in severing the dry fibre rovings, at least some dry fibre rovings are severed independently of one another by at least one severing unit.

### Claim 21 (depends on 15)

The process according to claim 15, wherein the binder is activated by any one or more of: contact pressure, thermal radiation, microwave radiation, infrared radiation, UV radiation, laser radiation, inductive energy, and contact heating.

### Claim 22 (depends on 15)

The process according to claim 15, wherein, after the fibres have been laid and fixed to form the fibre preform, the dry fibre rovings are impregnated or infiltrated with a curable plastics material on the three-dimensionally contoured mould to form a fibre composite.
