Hydrocarbons production installation and method
AssigneeTotal SA
InventorsEmmanuel Toguem Nguete, Jean-Louis Beauquin
Life of this patent
Estimating the term…
Loading patent…
AssigneeTotal SA
InventorsEmmanuel Toguem Nguete, Jean-Louis Beauquin
Estimating the term…
Some embodiments include a heavy-oil-based hydrocarbons effluent production installation for the production of hydrocarbons from at least one well. The installation includes an effluent-lightening fluid injection system at the bottom of the well, an effluent-evacuation pump, a plurality of sensors that measure physical units relating to the installation, and an automated device suitable for optimizing the lightening-fluid injection flow-rate and for regulating the pump speed. The automated device regulates the pump speed according to the physical units and a predetermined target production value. The speed of the pump and the physical units are within a predetermined range of values. some embodiments include a hydrocarbons production method in such an installation. Some embodiments make it possible to ensure a minimum consumption of lightening fluid, while ensuring good operation of the pump and good productivity of the well.
A heavy-oil-based hydrocarbons effluent production installation for a production of hydrocarbons from at least one well, the installation comprising:
A heavy-oil-based hydrocarbons effluent production method in an installation that comprises an effluent-lightening fluid injection system at a bottom of a well, an effluent-evacuation pump, a plurality of sensors measuring physical units relating to the installation and an automated device, the method comprising:
A heavy-oil-based hydrocarbons effluent production installation for the production of hydrocarbons from at least one well, the installation comprising:
Dependencies are inferred from the claim text.