# US 8,739,496 B2 · Structure and construction method using a transparent or translucent member

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 8,739,496 B2
- Document ID: US8739496B2
- Status: Granted
- Kind: B2
- Application number: 13/785,444
- Filed: 2013-03-05
- Published: 2014-05-01
- Granted: 2014-06-03
- Earliest claimed: 2012-10-26
- Applicants: David Brodowski
- Inventors: David Brodowski
- Web page: https://patentgrep.com/patent/US8739496B2

## CPC

- E04B 5/38: with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element {(beams placed against one another and acting as permanent forms E04B5/23)}
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})

## Abstract

A construction method is disclosed. The method includes providing a bottom support between a plurality of structural members and using the bottom support to support a structural material in a plastic state. The method also includes using the bottom support to support the structural material as it hardens from a plastic state into a hardened state. The structural material remains attached to the bottom support after the structural material hardens. The bottom support is transparent or translucent.

## Claims

### Claim 1

A construction method, comprising:
providing a bottom support between a plurality of structural members;
using the bottom support to support a structural material in a plastic state; and
using the bottom support to support the structural material as the structural material hardens from a plastic state into a hardened state;
wherein the structural material remains in contact with the bottom support after the structural material hardens, the structural material and the bottom support forming a structural assembly;
wherein the bottom support is transparent or translucent;
wherein the plurality of structural members transfers load from the structural assembly to additional structural elements;
wherein the structural material in the plastic state is concrete in a plastic state;
wherein the structural material in the hardened state is structural reinforced concrete; and
wherein the plurality of structural members are bridge superstructure structural members.

### Claim 2

A construction method, comprising:
providing a form member between a plurality of structural members;
providing a supporting member between the plurality of structural members, the supporting member being supported by the structural members;
supporting the form member with the supporting member; and
providing a structural material in a plastic state on the form member;
wherein the form member is transparent or translucent;
wherein a lower surface of the form member is in bearing contact with an upper surface of the supporting member;
wherein the structural material in the plastic state is concrete in a plastic state; and
removing the supporting member after the structural material hardens, and re-using the supporting member to support another form member at another location.

### Claim 3 (depends on 2)

The construction method of claim 2, wherein the supporting member is a removable form that is transparent or translucent.

### Claim 4 (depends on 3)

The construction method of claim 3, further including providing additional removable forms that are stacked beneath the form member and the supporting member that is a removable form.

### Claim 5 (depends on 2)

The construction method of claim 2, wherein the form member is a corrugated form, and the supporting member is a removable corrugated metal form that is nested with the form member.

### Claim 6 (depends on 2)

The construction method of claim 2, wherein:
the form member is one of a substantially flat member or a corrugated member; and
the form member is transparent plastic.

### Claim 7 (depends on 2)

The construction method of claim 2, wherein:
a lower surface of the form member is in bearing contact with an upper surface of the supporting member;
the supporting member is one of a reinforcing bar, a prefabricated structural shape, and a plate; and
the supporting member is made from one or more of steel, wood, and composite material.

### Claim 8

A construction method, comprising:
providing a stay-in-place form between a plurality of structural members;
providing a supporting member between the plurality of structural members, the supporting member being supported by the plurality of structural members;
supporting the stay-in-place form with the supporting member, wherein the stay-in-place form is in contact with the supporting member;
providing uncured concrete in a plastic state on the stay-in-place form; and
removing the supporting member after the concrete cures;
wherein the stay-in-place form is transparent or translucent; and
wherein the plurality of structural members transfers load from the supporting member to additional structural elements or directly to the ground;
wherein providing the supporting member includes providing a supporting member including two elements and a coupler coupling the two elements; and
wherein removing the supporting member includes displacing a first end of at least one of the two elements of the supporting member into the coupler so that a second end of the at least one of the two elements displaces away from the structural member supporting the at least one element.

### Claim 9 (depends on 8)

The construction method of claim 8, wherein:
displacing the at least one of the two elements of the supporting member into the coupler includes doweling a threaded end portion of the at least one of the two elements of the supporting member into a threaded aperture of the coupler.

### Claim 10 (depends on 8)

The construction method of claim 8, further including re-using the supporting member to support another stay-in-place form at another location.

### Claim 11 (depends on 8)

The construction method of claim 8, wherein removing the supporting member includes saw-cutting the supporting member.

### Claim 12 (depends on 8)

The construction method of claim 8, wherein providing the stay-in-place form between the plurality of structural members includes attaching the stay-in-place form to a plurality of intermediate structural members, at least one of the plurality of intermediate structural members being attached to each structural member.

### Claim 13 (depends on 12)

The construction method of claim 12, wherein attaching the stay-in-place form to the plurality of intermediate structural members includes epoxying the stay-in-place form to the plurality of intermediate structural members.

### Claim 14 (depends on 12)

The construction method of claim 12, wherein attaching the stay-in-place form to the plurality of intermediate structural members includes fastening an end portion of the stay-in-place form to at least one of the intermediate structural members via an alignment pin.
