Full-kit management in projects: checking full-kit compliance
AssigneeRealization Technologies, Inc.
InventorsAjai Kapoor, Pankaj P. Painuly, Travis F. Higgins, Puneet Murgai, Corvin Bazgan, Subramanian Muthu
Life of this patent
Estimating the term…
Loading patent…
AssigneeRealization Technologies, Inc.
InventorsAjai Kapoor, Pankaj P. Painuly, Travis F. Higgins, Puneet Murgai, Corvin Bazgan, Subramanian Muthu
Estimating the term…
Methods and apparatuses are described for creating and using full-kit tasks, monitoring the progress of full-kit tasks, determining full-kit dates, checking compliance of release conditions associated with full-kit tasks, and/or computing and reporting full-kit task delays. A full-kit task can be used in the project plan to represent the preparations that are required or recommended to be performed before executing a set of tasks. The full-kit task can be a zero-duration task that has a full-kit date and that includes a list of items which need to be completed by the full-kit date. The full-kit task is capable of being in one of the following states: not started, in progress, released, and completed. In some embodiments, the set of tasks associated with the full-kit task can only be started if the full-kit task is either in the released state or the completed state.
A method for checking compliance with a release condition of a full-kit task, the method comprising:
A non-transitory computer-readable storage medium storing instructions that, when executed by a computer, cause the computer to perform a method for checking compliance with a release condition of a full-kit task, the method comprising:
A system, comprising:
Dependencies are inferred from the claim text.