Gas cutoff apparatus
AssigneePanasonic Corporation
InventorKouichi Ueki
Life of this patent
Estimating the term…
Loading patent…
AssigneePanasonic Corporation
InventorKouichi Ueki
Estimating the term…
An object is to detect an abnormality when the inside of a gas cutoff apparatus is submerged. A flow rate computing unit 15 computes an instantaneous flow rate from a detected value of a flow rate detecting unit 8 for measuring a flow rate, and an amplification degree determining unit 18 determines signal amplification adjusted by the flow rate detecting unit 8, and timing is started when the amplification degree is a predetermined value or more, and a measurement condition setting unit 16 sets a measurement condition of the flow rate detecting unit 8 from the flow rate obtained by the flow rate computing unit 15, and a measurement ratio computing unit 20 obtains a measurement condition ratio during predetermined time from a time measuring unit 19 and the measurement condition setting unit 16, and it is determined that the flow rate detecting unit 8 is abnormal when the measurement ratio is a predetermined ratio or more, and a cutoff unit 22 breaks supply of gas.
A gas cutoff apparatus for cutting off supply of gas when an abnormality occurs, comprising:
A gas cutoff apparatus for cutting off supply of gas when an abnormality occurs, comprising:
Dependencies are inferred from the claim text.