# US 8,578,381 B2 · Apparatus, system and method for rapid resource scheduling in a compute farm

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 8,578,381 B2
- Document ID: US8578381B2
- Status: Granted
- Kind: B2
- Application number: 11/925,437
- Filed: 2007-10-26
- Published: 2009-04-30
- Granted: 2013-11-05
- Earliest claimed: 2007-10-26
- Assignees: Oracle America, Inc.
- Applicants: Sharma R. Podila
- Inventors: Sharma R. Podila
- Web page: https://patentgrep.com/patent/US8578381B2

## CPC

- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 9/5038: {considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration (scheduling strategies G06F9/4881 and subgroups)}
- G06F 9/5072: {Grid computing}
- G06F 2209/5021: Priority
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Disclosed herein is a method for scheduling computing jobs for a compute farm. The method includes: receiving a plurality of computing jobs at a scheduler; assigning a signature to each computing job based on at least one computing resource requirement of the computing job; storing each computing job in a signature classification corresponding to the signature of the computing job; and scheduling at least one of the plurality of computing jobs for processing in the compute farm as a function of the signature classification.

## Claims

### Claim 1

A method for scheduling computing jobs for a compute farm, the method comprising:
receiving a plurality of computing jobs at a scheduler;
assigning a signature to each computing job based on at least one computing resource requirement of the computing job;
storing each computing job in a signature classification corresponding to the signature of the computing job;
assigning a hard to schedule indication to a first signature classification and an easy to schedule indication to a second signature classification, wherein the hard to schedule indication indicates a signature classification with computing jobs with resource requirements that include at least one of rare resources and large amounts of resources;
selecting the first signature classification;
determining if a computing job of the first signature classification can be scheduled during a first scheduling iteration, wherein if the computing job of the first signature classification cannot be scheduled during the first scheduling iteration, performing the operations of:
considering scheduling complete for the first signature classification and selecting the second signature classification;
determining a minimum number of computing jobs criteria for the second signature classification; and
scheduling at least one computing job of the second signature classification based on the determined minimum number of computing jobs criteria; and
wherein if the computing job of the first signature classification can be scheduled during the first scheduling iteration, scheduling the computing job of the first signature classification for processing in the compute farm as a function of the signature classification.

### Claim 2 (depends on 1)

The method of claim 1, further comprising characterizing signature classifications as having a high priority or a low priority with respect to performing a scheduling iteration.

### Claim 3 (depends on 2)

The method of claim 2, wherein the high priority signature classifications are those containing computing jobs with resource requirements that include at least one of rare resources and large amounts of resources.

### Claim 4 (depends on 3)

The method of claim 3, wherein a rare resource is a license.

### Claim 5 (depends on 3)

The method of claim 3, further comprising addressing the high priority signature classifications with respect to scheduling before addressing the low priority signature classifications with respect to scheduling.

### Claim 6 (depends on 1)

The method of claim 1, further comprising limiting the number computing jobs of a signature classification that can be scheduled during a scheduling iteration based on a maximum number of computing job criteria.

### Claim 7 (depends on 1)

The method of claim 1, further comprising limiting the number computing jobs of a signature classification that can be scheduled during a scheduling iteration based on a maximum time in the future criteria.

### Claim 8 (depends on 1)

The method of claim 1, further comprising selecting a signature classification for scheduling according to service level agreements, policies, constraints, or priorities.

### Claim 9 (depends on 8)

The method of claim 8, further comprising selecting a computing job within the selected classification according to service level agreements, policies, constraints, or priorities.

### Claim 10 (depends on 8)

The method of claim 8, wherein at least one policy requires that a first certain computing job gets a certain percentage of a resource capacity of the compute farm and a second certain computing job gets another certain percentage of the resources capacity.

### Claim 11 (depends on 8)

The method of claim 8, wherein at least one constraint mandates that at least one of no certain computing job and no certain client can consume more than a certain percentage of a resource capacity of the compute farm at any one time.

### Claim 12 (depends on 8)

The method of claim 8, wherein at least one priority identifies a first certain computing job or signature classification as being critical to complete prior to a second certain computing job or signature classification.

### Claim 13

A system for scheduling computing jobs for a compute farm, the system comprising:
a scheduler comprising a processor and storage,
wherein the processor causes each computing job provided to the scheduler to be assigned a signature based on at least one computing resource requirement of the computing job,
wherein the processor causes each computing job to be assigned to a signature classification within the storage corresponding the signature of the computing job,
wherein the processor assigns a hard to schedule indication to a first signature classification and an easy to schedule indication to a second signature classification, wherein the hard to schedule indication indicates a signature classification with computing jobs with resource requirements that include at least one of rare resources and large amounts of resources;
wherein the processor selects the first signature classification and determines if a computing job of the first signature classification can be scheduled during a first scheduling iteration,
wherein if the computing job of the first signature classification cannot be scheduled during the first scheduling iteration, the processor ends scheduling for the first signature classification and selects a second signature classification, determines a minimum number of computing jobs criteria for the second signature classification and schedules at least one computing job of the second signature classification based on the determined minimum number of computing jobs criteria, and
wherein if the computing job of the first signature classification can be scheduled during the first scheduling iteration, the scheduler schedules the computing job of the first signature classification for processing in the compute farm as a function of the signature classification.

### Claim 14 (depends on 13)

The system of claim 13, wherein the storage is a cache.

### Claim 15 (depends on 13)

The system of claim 13, wherein the processor characterizes signature classifications as having a high priority or a low priority with respect to performing a scheduling iteration.

### Claim 16 (depends on 15)

The system of claim 15, wherein the high priority signature classifications are those containing computing jobs with resource requirements that include rare resources or large amounts of resources.

### Claim 17 (depends on 16)

The system of claim 16, wherein a rare resource is a license.

### Claim 18 (depends on 16)

The system of claim 16, wherein the processor addresses the high priority signature classifications with respect to scheduling before addressing the low priority signature classifications with respect to scheduling.

### Claim 19 (depends on 13)

The system of claim 13, wherein the processor limits the number computing jobs of a signature classification that can be scheduled during a scheduling iteration based on a maximum number of computing job criteria.

### Claim 20 (depends on 13)

The system of claim 13, wherein the processor limits the number computing jobs of a signature classification that can be scheduled during a scheduling iteration based on a maximum time in the future criteria.

### Claim 21 (depends on 13)

The system of claim 13, wherein the processor selects a signature classification for scheduling according to service lever agreements, policies, constraints, or priorities.

### Claim 22 (depends on 21)

The system of claim 21, wherein the processor selects a computing job within the selected classification according to service level agreements, policies, constraints, or priorities.

### Claim 23 (depends on 21)

The system of claim 21, wherein at least one of a policy, constraint and priority is a follows:
a. at least one policy requires that a first certain computing job gets a certain percentage of a resource capacity of the compute farm and a second certain computing job gets another certain percentage of the resources capacity;
b. at least one constraint mandates that at least one of no certain computing job and no certain client can consume more than a certain percentage of a resource capacity of the compute farm at any one time; and
c. at least one priority identifies a first certain computing job or signature classification as being critical to complete prior to a second certain computing job or signature classification.