# US 8,578,202 B2 · System and method for providing high availability for distributed application

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 8,578,202 B2
- Document ID: US8578202B2
- Status: Granted
- Kind: B2
- Application number: 12/846,056
- Filed: 2010-07-29
- Published: 2012-02-02
- Granted: 2013-11-05
- Earliest claimed: 2010-07-29
- Assignees: CA, Inc.
- Applicants: Guodong Li; Hailin Peng; Zhenghua Xu; Ran Shuai
- Inventors: Guodong Li; Hailin Peng; Zhenghua Xu; Ran Shuai
- Web page: https://patentgrep.com/patent/US8578202B2

## CPC

- G06F 11/2097: {maintaining the standby controller/processing unit updated (initialisation or re-synchronisation thereof G06F11/1658 and subgroups)}
- G06F 11/203: {using migration}
- G06F 11/2038: {with a single idle spare processing component}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A system and method is provided for ensuring high availability for a distributed application. A management object manages multiple scenarios defined for protection units associated with a distributed application. The management object may coordinate various operations performed at the protection units based on management object configuration information.

## Claims

### Claim 1

A computer-implemented method for providing high availability for a distributed application distributed across a plurality of protection units, each protection unit being described by a scenario and including at least one active server and at least one standby server, the method executed by one or more processors configured to perform a plurality of operations, the operations comprising:
receiving an indication that a transfer from a first active server to a first standby server of a first protection unit of the distributed application has or will occur, the first protection unit executing at least a first portion of the distributed application, wherein the first protection unit comprises the first active server and the first standby server;
determining a relationship between a first scenario that describes the first protection unit and a second scenario that describes a second protection unit of the distributed application, the second protection unit executing at least a second portion of the distributed application, and wherein the second protection unit comprises a second active server and a second standby server; and
coordinating one or more operations to be performed at the first protection unit and the second protection unit based on the relationship and the indication of the transfer, wherein said coordinating comprises performing a first transfer from the first active server to the first standby server of the first protection unit and performing a second transfer from the second active server to the second standby server of the second protection unit.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein the one or more operations include one or more of a failover operation, a switchover operation, a run operation and a stop operation.

### Claim 3 (depends on 1)

The computer-implemented method of claim 1, wherein said determining a relationship further comprises:
determining a relation type associated with the relationship between the first and second scenarios, wherein the relation type includes a failover together relation indicating that the first active server and the second active server failover together to the first standby server and the second standby server, respectively, a switchover together relation indicating that the first active server and the second active server switchover together to the first standby server and the second standby server, respectively, a run together relation indicating that the first active server and the second active server run together with the first standby server and the second standby server, respectively, or a stop together relation indicating that the first active server and the second active server stop together with the first standby server and the second standby server, respectively.

### Claim 4 (depends on 1)

The computer-implemented method of claim 1, the operations further comprising:
sending one or more management operations to one or more management object instances associated with the first and second protection units, wherein the one or more management object instances send one or more scenario operations to one or more scenario object instances associated with the first and second protection units.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, wherein information regarding the relationship is defined by a user.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein said coordinating one or more operations is performed by a management object instance associated with a centralized control point communicably coupled to the first protection unit and the second protection unit.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, wherein the relationship includes dependency information between the first scenario and the second scenario, the one or more operations being coordinated based at least in part on the dependency information.

### Claim 8

A non-transitory computer-readable storage medium having one or more computer-readable instructions thereon which when executed by one or more processors cause the one or more processors to:
receive an indication that a transfer from a first active server to a first standby server of a first protection unit of a distributed application has or will occur, the first protection unit executing at least a first portion of the distributed application, the distributed application distributed across at least the first protection unit and a second protection unit, wherein the first protection unit comprises the first active server and the first standby server;
determine a relationship between a first scenario that describes the first protection unit and a second scenario that describes the second protection unit of the distributed application, the second protection unit executing at least a second portion of the distributed application, and wherein the second protection unit comprises a second active server and a second standby server; and
coordinate one or more operations to be performed at the first protection unit and the second protection unit based on the relationship and the indication of the transfer, wherein said instructions causing the processors to coordinate further cause the processors to perform a first transfer from the first active server to the first standby server of the first protection unit and perform a second transfer from the second active server to the second standby server of the second protection unit.

### Claim 9 (depends on 8)

The non-transitory computer-readable storage medium of claim 8, wherein the one or more operations include one or more of a failover operation, a switchover operation, a run operation and a stop operation.

### Claim 10 (depends on 8)

The non-transitory computer-readable storage medium of claim 8, wherein the one or more computer-readable instructions causing the one or more processors to determine a relationship further include instructions causing the one or more processors to:
determine a relation type associated with the relationship between the first and second scenarios, wherein the relation type includes a failover together relation indicating that the first active server and the second active server failover together to the first standby server and the second standby server, respectively, a switchover together relation indicating that the first active server and the second active server switchover together to the first standby server and the second standby server, respectively, a run together relation indicating that the first active server and the second active server run together with the first standby server and the second standby server, respectively, or a stop together relation indicating that the first active server and the second active server stop together with the first standby server and the second standby server, respectively.

### Claim 11 (depends on 8)

The non-transitory computer-readable storage medium of claim 8, wherein the one or more computer-readable instructions further include instructions causing the one or more processors to:
send one or more management operations to one or more management object instances associated with the first and second protection units, wherein the one or more management object instances send one or more scenario operations to one or more scenario object instances associated with the first and second protection units.

### Claim 12 (depends on 8)

The non-transitory computer-readable storage medium of claim 8, wherein the relationship includes dependency information between the first scenario and the second scenario, the one or more operations being coordinated based at least in part on the dependency information.

### Claim 13

A computer-implemented system for providing high availability for a distributed application distributed across a plurality of protection units, each protection unit being described by a scenario and including at least one active server and at least one standby server, the system comprising:
one or more processors configured to:
receive an indication that a transfer from a first active server to a first standby server of a first protection unit of the distributed application has or will occur, the first protection unit executing at least a first portion of the distributed application, wherein the first protection unit comprises the first active server and the first standby server;
determine a relationship between a first scenario that describes the first protection unit and a second scenario that describes a second protection unit of the distributed application, the second protection unit executing at least a second portion of the distributed application, and wherein the second protection unit comprises a second active server and a second standby server; and
coordinate one or more operations to be performed at the first protection unit and the second protection unit based on the relationship and the indication of the transfer, wherein the processors configured to coordinate are further configured to perform a first transfer from the first active server to the first standby server of the first protection unit and perform a second transfer from the second active server to the second standby server of the second protection unit.

### Claim 14 (depends on 13)

The computer-implemented system of claim 13, wherein the one or more operations include one or more of a failover operation, a switchover operation, a run operation and a stop operation.

### Claim 15 (depends on 13)

The computer-implemented system of claim 13, wherein the one or more processors configured to determine a relationship further comprise one or more processors configured to:
determine a relation type associated with the relationship between the first and second scenarios, wherein the relation type includes a failover together relation indicating that the first active server and the second active server failover together to the first standby server and the second standby server, respectively, a switchover together relation indicating that the first active server and the second active server switchover together to the first standby server and the second standby server, respectively, a run together relation indicating that the first active server and the second active server run together with the first standby server and the second standby server, respectively, and or a stop together relation indicating that the first active server and the second active server stop together with the first standby server and the second standby server, respectively.

### Claim 16 (depends on 13)

The computer-implemented system of claim 13, wherein the one or more processors are further configured to:
send one or more management operations to one or more management object instances associated with the first and second protection units, wherein the one or more management object instances send one or more scenario operations to one or more scenario object instances associated with the first and second protection units.

### Claim 17 (depends on 13)

The computer-implemented system of claim 13, wherein the relationship includes dependency information between the first scenario and the second scenario, the one or more operations being coordinated based at least in part on the dependency information.

### Claim 18 (depends on 1)

The computer-implemented method of claim 1, wherein the relationship includes a particular sequence in which the first transfer and the second transfer are to be performed, and wherein said coordinating further comprising:
performing the first transfer and the second transfer according to the particular sequence.

### Claim 19 (depends on 8)

The non-transitory computer-readable storage medium of claim 8, wherein the relationship includes a particular sequence in which the first transfer and the second transfer are to be performed, and wherein said instructions causing the processors to coordinate further cause the processors to:
perform the first transfer and the second transfer according to the particular sequence.

### Claim 20 (depends on 13)

The computer-implemented system of claim 13, wherein the relationship includes a particular sequence in which the first transfer and the second transfer are to be performed, and wherein the processors configured to coordinate are further configured to:
perform the first transfer and the second transfer according to the particular sequence.
